Fujitsu ASYA07LGC Service Instruction page 30

Hide thumbs Also See for ASYA07LGC:
Table of Contents

Advertisement

Defrost Flow Chart
The defrosting shall proceed by the integrating operation time
and outdoor heat exchanger temperature as follows.
Heating operation start : Compressor ON
Compressor integrating
operation:
Over 25 minutes to
below 240 minutes
Outdoor heat exchanger
temperature:
Below - 6°C
Outdoor heat exchanger temperature:
Over 16°C or
Compressor ON time: Over 15 minutes
(Not defrosted for 10 minutes)
Compressor integrating
operation:
Over 240 minutes
Outdoor heat exchanger
temperature:
Below - 3°C
Defrost start
Defrost Indicator:
[Operation lamp]
7 sec ON / 2 sec OFF
Compressor OFF
Outdoor fan motor OFF
30 sec later 4 - way valve OFF
36 sec later compressor ON
Defrost end
05-15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Asya14lgcAoyr07lgcAoyr09lgcAoyr14lgcAsya09lgcAsya12lgc

Table of Contents