Baxi PRIME HT 240 Installers And Users Instructions page 24

Table of Contents

Advertisement

IMPORTANT: If the appliance is being converted from natural gas to propane (LPG), the following operations must be
performed before calibrating the gas valve as instructed above.
Turn adjuster screw (V) on the gas valve clockwise through the number of complete revolutions specified in table 3.
On the QAA73 temperature regulator, set parameters 608 and 611 governing ignition power as instructed in section
26. See table 3 for the values to be set.
TABLE 1: CO
PRIME HT 330 - HT 1.280
CO
max. heat output
2
CO
min. heat output
2
Gas nozzle
Table 1a
PRIME HT 1.240
PRIME HT 240
PRIME HT 280
CO
max. heat output
2
CO
min. heat output
2
Gas nozzle
Table 1b
PRIME HT 1.120
CO
max. heat output
2
CO
min. heat output
2
Gas nozzle
Table 1c
TABLE 2: CONSUMPTIONS MAX E MIN OUTPUT.
PRIME HT 330
Gas consumption at 15 °C
1013 mbar
PCI
Consumption at max. heat output
Consumption at min. heat output
Table 2a
PRIME HT 280
Gas consumption at 15 °C
1013 mbar
PCI
Consumption at max. heat output
Consumption at min. heat output
Table 2b
PRIME HT 1.280
Gas consumption at 15 °C
1013 mbar
PCI
Consumption at max. heat output
Consumption at min. heat output
Table 2c
COMBUSTIONS; GAS NOZZLE.
2
G20 - 2H - 20 mbar
G31 - 3P - 37 mbar
8,7%
8,4%
12,0 mm
G20 - 2H - 20 mbar
G31 - 3P - 37 mbar
8,7%
8,4%
7,5 mm
G20 - 2H - 20 mbar
G31 - 3P - 37 mbar
8,7%
8,4%
4,0 mm
G20 - 2H - 20 mbar
G31 - 3P - 37 mbar
34.02 MJ/m
3
3.59 m
/h
3
1.06 m
/h
3
G20 - 2H - 20 mbar
G31 - 3P - 37 mbar
34.02 MJ/m
3
3.06 m
3
/h
0,95 m
3
/h
G20 - 2H - 20 mbar
G31 - 3P - 37 mbar
34.02 MJ/m
3
3.06 m
/h
3
1,06 m
/h
3
INSTRUCTIONS FOR THE INSTALLER
10%
9,8%
12,0 mm
10%
9,5%
7,5 mm
10%
9,5%
4,0 mm
46.3 MJ/kg
2.64 kg/h
0.78 kg/h
46.3 MJ/kg
2.25 kg/h
0.70 kg/h
46.3 MJ/kg
2.25 kg/h
0.78 kg/h
24

Advertisement

Table of Contents
loading

Table of Contents