Sharp XV-Z2000 Service Manual page 19

Hide thumbs Also See for XV-Z2000:
Table of Contents

Advertisement

Available languages

Available languages

5. Removing the optical mechanism unit
5-1. Remove the fixing screw from the PWB bracket.
5-2. Remove 2 fixing screws for the ballast output socket, and remove the ballast output socket.
5-3. Remove 5 fixing screws for the optical mechanism unit, and remove the optical mechanism unit.
5-4. Remove the duct, pulling up the optical mechanism unit.
5-5. Remove the speaker cover.
6. Removing the power/ballast unit
6-1. Remove 3 fixing screws for the power/ballast unit.
5-2
5-3
5-4
Duct
Ballast Output Socket
5-3
6-1
Power/Ballast Unit
Optical Mechanism Unit
5-1
PWB Bracket
5-5
6-1
19
XV-Z2000
DT-400
Speaker Cover

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dt-400

Table of Contents