located n otlessthan18inches ( 457 mm) a bove thefloor.
Protect thefurnace f romphysical damage b yvehicles.
• If thefurnace i s installed h orizontally, thefurnace a ccess
doors must b evertical sothattheburners firehorizontally
intotheheatexchanger. Donotinstall theunitwiththe
access d oors onthe"up/top" or"down/bottom"
sideofthe
furnace.
• Donotconnect this furnace t oa chimney fluethat s erves a
separate a ppliance designed t oburnsolidfuel.
• OnCounterflow installations,
theairconditioning
coilmust
bedownstream from theheat e xchanger ofthefurnace.
Counterflow
Installation
over
a noncombustible
floor.
Before
setting
the furnace
over the plenum
opening,
ensure
the surface
around
the opening
is smooth
and level. A tight
seal should
be made
between
the furnace
base
and floor
by using
a silicone
rubber
caulking
compound
or cement
grout.
• Counterflow
Installation
over
a combustible
floor.
If
installation
over
a combustible
floor
becomes
necessary,
use
an accessory
subbase
(see
Product
Data
Book
applicable
to your
model*
for details).
A special
accessory
subbase
must
be
used
for
upright
counterflow
unit
installations
over any combustible
material
including
wood.
Refer
to subbase
instructions
for
installation
details.
Follow
the
instructions
with
the
subbase
for
proper
installation.
Do not install
the furnace
directly
on carpeting,
tile, or other combustible
material
other
than wood flooring.
(Note:
The
subbase
will
not
be
required
if an
air
conditioning
coil is installed
between
the supply
air opening
on the furnace
and the floor.)
Vent Pipe Clearance to Combustibles-
6" using Single Wall Connector or 1"
using B-I vent.
Side
Clearance
Front Clearance - 3"
• Adequate
combustion/ventilation
air must
be supplied
to
the closet.
• Furnace
must
be completely
sealed
to floor
or base.
Combustion/
ventilation
air supply
pipes
must
terminate
12" from top of closet
and 12" from floor of closet.
DO NOT
remove
solid
base
plate
for side return.
• Return
air ducts
must be completely
sealed
to the furnace
and terminate
outside
the enclosure
surfaces.
CLEARANCES
AND ACCESSIBILITY
Unobstructed
front
clearance
of
24"
for
servicing
is
recommended.
VENT
SIDES
FRONT
BACK
BI-VENT
I SINGLE
I"
6"
1"
3"
0"
Top
clearance
for
horizontal
configuration
- 1"
TOP
(PLENUM)
I"
HORIZONTAL INSTALLATION
Line contact to framing
is permitted
when installed
in the horizontal
configuration.
Line contact
is defined
as the portion
of the cabinet
that
is formed
by
the
intersection
of
the
top
and
side,
ACCESSIBILITY
CLEARANCE,WHERE
GREATER,
SHOULD
TAKE
PRECEDENCE
OVER
MINIMUM
FIRE
PROTECTION
CLEARANCE.
A gas-fired
furnace
for installation
in a residential
garage
must
be installed
so that the ignition
source
and burners
are
located
not less
than
eighteen
inches
(18")
above
the floor
and is protected
or located
to prevent
physical
damage
by vehicles.
A gas furnace
must
not be installed
directly
on carpeting,
tile, or
other
combustible
materials
other
than
wood
flooring.
FURNACE SUSPENSION
If suspending
the furnace
from
rafters
or joist,
use 3/8"
threaded
rod and 2"x2"x3/8"
angle
iron as shown
below.
The length
of rod
will depend
on the application
and the clearances
necessary.
PROVIDE
8" MINMUM
CLEARANCE
BETWEEN
CENTER
ROD AND
FURNACE
CABINET
3/8"
DIAMETER
HOL" tTOW
E°;;°tT
2" X 2" X 3/8"
ANGLE
IRON
POSITION
AS CLOSE
AS POSSIBLE
{3 PLACEE)
TO BLOWER
DECK
TO ALLOW
FOR
CIRCULATOR
BLOWER
REMVOAL
ASSURE
FURNACE
IS LEVEL
FROM
END
TO END AND
HAS A SLIGHT
FORWARD
TILT WITH
THE
FRONT
OF THE FURNACE
0"-3/4"
BELOW
THE BACK
OF THE
FURNACE
TILT
OUTWARD
TO ALLOW
FOR
DOOR
AND
CIRCULATOR
BLOWER
REMOVAL
Suspended
Furnace
EXISTING FURNACE
REMOVAL
NOTE:
When
an existing
furnace
is removed
from a venting
system
serving
other
appliances,
the venting
system
may be too large
to
properly
vent
the remaining
attached
appliances.
The
following
vent
testing
procedure
is reproduced
from
the
American
National
Standard/National
Standard
of Canada
for
Gas-Fired
Central
Furnaces
ANSI
Z21.47-Latest
Edition,
CSA-
2.3-Latest
Edition
Section
1.23.1.
The following
steps
shall
be
followed
with
each
appliance
connected
to the venting
system
placed
in operation,
while
any other
appliances
connected
to the
venting
system
are not in operation:
a. Seal
any unused
openings
in the venting
system;
b. inspect
the venting
system
for proper
size
and horizontal
pitch,
as required
by the National
Fuel
Gas
Code,
ANSI
Z223.1
or the CAN/CSA
B149
installation
Codes
and these
instructions.
Determine
that
there
is no
blockage
or
restriction,
leakage,
corrosion
and other deficiencies
which
could
cause
an unsafe
condition;

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gdh8

Table of Contents