Termination Clearances; Assembling Vent Pipes - Monessen Hearth CDV7 Installation And Operating Instructions Manual

Cdvsc7 series, cdv7 series, direct vent gas fireplace
Table of Contents

Advertisement

VenTInG InSTallaTIon InFoRMaTIon

Termination Clearances

Termination clearances for buildings with combustible and noncombustible exteriors.
Inside Corner
G =
Combustible
G
Noncombustible
V
Balcony -
with no side wall
M
M =
Combustible &
Noncombustible
12" (305 mm)
*noTe: Termination in an alcove space (spaces open only on one side and with an overhang) is permitted with the dimensions specified for vinyl or
non-vinyl siding and soffits. 1. There must be a 3' (914 mm) minimum between termination caps. . All mechanical air intakes within 10' (1 m) of a
termination cap must be a minimum of 3' (914 mm) below the termination cap. 3. All gravity air intakes within 3' (914 mm) of a termination cap must
be a minimum of 1' (305 mm) below the termination cap.
GeneRal InFoRMaTIon aSSeMBlInG VenT pIpeS
uSa Installations
The venting system must conform to local codes and/or
the current National Fuel Code ANSI Z3.1/NFPA 54.
Only venting components manufactured by MHSC may
be used in Direct Vent systems.
Canadian Installations
The venting system must be installed in accordance with
the current CSA-B149.1 installation code.
Flex Vent pipes
Before joining the flex vent pipe to the unit, apply a bead
of high temperature sealant* (provided) to the 4" pipe
exiting the fireplace. Secure flex vent pipe in place with
a hose clamp (provided).
*Be sure the flex pipe overlaps at least 1" (5 mm) onto
the collars of the fireplace and termination. If the termi-
nation has an internal bead, be sure to overlap and se-
cure 1" (5 mm) past the bead.
69D3011
Outside Corner
6" (152 mm)
V
2" (51 mm)
Balcony -
with perpendicular side wall
V
Combustible &
Noncombustible
M = 24" (610 mm)
P = 20" (508 mm)
CDVSC7 & CDV7 Series Gas Fireplace
F =
Combustible
6" (152 mm)
Noncombustible
2" (51 mm)
F
M
V
P
Figure 9 -
Termination Clearances
* Be sure the vent is actually crushed before proceeding.
Apply a tug to be sure the vent will not slip off the collars.
Repeat process with 7" flex vent pipe. The same proce-
dure must be performed on the vent side.
FP90
Figure 10 -
Apply high temperature sealant to 4" and 7" pipes.
Alcove Applications*
D
C
V
E
O
E
= Min. 6" (152 mm) for
non-vinyl sidewalls
Min. 12" (305 mm) for
vinyl sidewalls
O
= 8' (2.4 m) Min.
No.
of Caps
D
Min.
1
3' (914 mm)  x D

6' (1.8 m)
3
9' (.7 m)
4
1' (3.7 m)
D
= # of Termination caps x 3
Min.
C
= ( / # termination caps) x D
Max.
Apply High Temperature
Sealant
C
C
Max.
Actual
1 x D
Actual
/3 x D
Actual
1/ x D
Actual
Actual
584-15
Hose Clamp
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents