Fireplace Framing - MHSC BBV400 Installation And Operating Instructions Manual

B-vent series natural vent gas fireplace
Table of Contents

Advertisement

BBV, SBV Series Natural Vent Gas Fireplaces

FIREPLACE FRAMING

Firebox framing can be built before or after the appliance is set in place. Construct firebox framing
following Figures 2 or 3 for your specific installation requirements. Refer to Figures 2 & 3 for firebox
dimensions. The framing headers may rest on the top of the firebox standoffs.
The firebox may be installed directly on a combustible floor or raised on a platform of an appropri-
ate height. When the firebox is installed directly on carpeting, tile or other combustible material,
other than wood flooring, the firebox shall be installed on a metal or wood panel extending the full
width and depth of the enclosure.
43 " (1102 mm)
Figure 2 -
BBV400 Fireplace
Dimensions and
Framing
Do not fill spaces around firebox with
insulation or other materials. This could
cause a fire.
6
Min. Rough 
Opening
Depth
14 "
(368 mm)
1/2" or 5/8" 
Drywall 
Spacers
9 "
(244 mm)
16 "
(426 mm)
7 "
(184 mm)
(56 mm)
FIREPLACE DIMENSIONS & FRAMING
31 " (797 mm)
1/2" or 5/8"
Drywall 
14"
Spacers
(356 mm)
40 " (1029 mm)
Min. Rough Opening Width
Min. Rough
Opening 
Height
40 "
(1029 mm)
36" (914 mm)
2
"
40" (1016 mm)
624037
400BBV dims
4" 
B-Vent
8"
(203 mm)
40"
(1016 mm)
34"
(864 mm)
21 "
(546 mm)
6"
(152 mm)
62D4036

Advertisement

Table of Contents
loading

Table of Contents