Advertisement

Quick Links

Operating Instructions

Pellet Stove Mellino

Advertisement

Table of Contents
loading

Summary of Contents for Spartherm Mellino

  • Page 1: Operating Instructions

    Operating Instructions Pellet Stove Mellino...
  • Page 2 PREFACE You have decided in favour of a Spartherm pellet stove - thank you for your confidence in our company. In a world of excess and mass production we hold to the motto of our owner Gerhard Manfred Rokossa: „High technical quality combined with contemporary design and service to the satisfaction of our customers so they will recommend us to others“.
  • Page 3: Table Of Contents

    CONTENT 1. Information 3.4 Cleaning the pellet chute 1.1 General information 3.5 Cleaning the ignition device 1.2 Rating plate 3.6 Cleaning the combustion chamber 1.3 Safety instructions 3.7 Emptying the ash drawer 1.4 Safety functions 3.8. Cleaning the hot-gas flues 1.5 Fuel –...
  • Page 4: Information

    These operating instructions describe the operation and the most important for complaint. maintenance tasks for the Mellino pellet stove. These instructions have been 1.2 RATING PLATE prepared primarily for the user of the pellet stove.
  • Page 5 • Do not place any objects on the pellet stove or in the area of its direct In particular, ensure that the necessary combustion air pipes are open radiant heat - fire hazard! during the operation of the fireplace insert. Simultaneous operation •...
  • Page 6: Safety Functions

    In the event of a longer power outage, after power is restored the control system will go into switch off mode and then restart the pellet stove with the The control system of the Mellino pellet stove offers safety functions that previously set operating parameters.
  • Page 7: Fuel - Wood Pellets

    For the Overheating Mellino, only use quality pellets that meet the requirements stipulated in The screw feeder and the pellet storage tank are monitored by an STL DIN 51731 or EN 14941-2. In addition to these requirements the wood pel- (safety temperature limiter).
  • Page 8: Operation And Startup

    3.1 have been executed. No damage must be pre- 2.3 THE DISPLAY sent on the Mellino before it goes into service, e.g. defective viewing pane. 2. Ensure that the burner plate is cleaned and is seated precisely in its The first 3 symbols, at top left, are warnings.
  • Page 9: The Remote Control Unit

    2.4 THE REMOTE CONTROL UNIT 1 On/Off switch 2 ESC button (back) Also error code query The most important settings of the pellet oven can also be made via the 3 Warning: Flue gas temperature too low or lack of pellets provided infrared remote control unit.
  • Page 10: Switching The Pellet Stove On And Off

    Whenever the Mel- the Mellino on or off. To do this you must have a clear line of sight to the lino is no longer intended to heat, you can switch it off using the Off button..
  • Page 11: Adjusting The Heating Capacity

    Operating mode: Standby (intermittent operation) Important information: Switch the Mellino on using the On button either at the display or by remote The set heating capacity is only effective as long as the appliance has not control to start the combustion process. If the set room temperature (tar- yet reached the preset target room temperature.
  • Page 12: Adjusting The Hot-Air Blower

    2.10 SETTING THE PELLET T YPE Directly on the display: The Mellino can be adapted to the pellet type used. There are three settings: Use the menu buttons to move to the thermometer symbol (the fifth symbol 1, 2 and 3. The factory setting is 1. In setting 2 rotational speeds of the flue from the right).
  • Page 13: Setting The Time / Date And Time

    Use the adjustment buttons + / - to set the pellet type to the desired value and press ENTER to save. The Mellino has 6 preset switch programs that are distributed over the day. Each switch program has the start time, the stop time and the target room We recommend leaving the setting on 1.
  • Page 14: Activating / Switching Off The Timer

    2.13 ACTIVATING / SWITCHING OFF THE TIMER 2.14 SELECTING A SWITCH PROGRAM Timer mode can be activated or switched off. Proceed as follows to do this: Proceed as follows to select a switch program: • Use the menu buttons to move to the clock symbol. Then press the + adjustment button 3x, [ 4 ] appears.
  • Page 15: Changing Switch Program Data

    Level Function d1 = Monday d2 = Tuesday Button lock (OFF, Lo or Hi) d3 = Wednesday Background brightness – display (1 to 5) d4 = Thursday Display settings idle (1, 2 ,3 and OFF) d5 = Friday d6 = Saturday Volume of the signal transmitter (1 to 5) d7 = Sunday Software versions of display (d…) and control system (c…)
  • Page 16 Level 2: Background brightness – display Use the adjustment buttons +/ - to go to level 4 in the Service menu, [ 4 ] After the button has been touched, the display is illuminated with full bright- appears and then the current setting. Press Enter, the current setting will ness.
  • Page 17: Cleaning And Maintenance

    Comply with all maintenance intervals and execute all cleaning tasks only • Maintenance executed by a trained specialist (see 3.11) when the Mellino is in cold status and switched off. 3.2 CLEANING THE VIEW PANE Note: Components in the combustion chamber can still be hot. Use the provided tool to lift out the burner plate.For your safety, unplug the mains...
  • Page 18: Cleaning The Burner Plate

    Tip: If there is heavier contamination, moisten the cloth with water or glass Note: Do not pour unconsumed pellets back into the pellet tank. cleaner, dip it in the ashes and rub the pane clean. Take out the burner Empty the burner plate into the ash Open the combustion chamber door Clean the pane with a dry cloth.
  • Page 19: Cleaning The Pellet Chute

    3.4 CLEANING THE PELLET CHUTE 3.5 CLEANING THE IGNITION DEVICE Cleaning interval: Daily or prior to each start-up Cleaning interval: Daily or prior to each start-up Check the pellet chute for contamination, foreign objects and deposits. If Use the provided lifting device to lift out the burner plate. Remove the ash necessary use the provided cleaning brush to remove encrustation on the residues and encrustation from the ignition pipe.
  • Page 20: Cleaning The Combustion Chamber

    3.6 CLEANING THE COMBUSTION CHAMBER 3.7 EMPT YING THE ASH DRAWER Cleaning interval: Weekly (every 5-7 operating days) Cleaning interval: Weekly (every 5-7 operating days) Lift out the burner plate for cleaning. Vacuum out the entire combustion Lift the ash drawer and pull it out. Empty the contents into a container that chamber, including the combustion air box with an ash vacuum.
  • Page 21: Cleaning The Hot-Gas Flues

    3.8. CLEANING THE HOT-GAS FLUES 3.9 CLEANING THE FLUE GAS MANIFOLD Cleaning interval: Monthly (every 30 operating days) Due to ash deposits in the hot-gas flues, over time heat transmission of the heating gases to the carcass walls worsens. This also reduces heat dissipa- Lift the baffle plate and guide it to the left and upward.
  • Page 22: Cleaning The Ash Collector

    3.10 CLEANING THE ASH COLLECTOR 3.11 YEARLY INSPECTION Cleaning interval: Monthly (every 30 operating days) As a standard measure for a gas or oil heating system, for a pellet stove a Unscrew both wing nuts and take off the cover plate. Check the sealing tape yearly inspection by a specialist is also effective in ensuring fault-free and for damage.
  • Page 23: Troubleshooting

    These standard warranty terms apply for the contractual relationship unplug it and plug it in again between the manufacturer, Spartherm Feuerungstechnik GmbH, and the dealer/distributor. These warranty conditions are not identical to those war- „Lack of pellets“...
  • Page 24: Warranty Period

    Spartherm Feuerungstechnik GmbH is not obliged to satisfy any claim if not invalidate the remaining provisions of the warranty. Within the scope of such documentation is not presented.
  • Page 25: Extension To The Warranty Period

    8,4 kW Damages and claims for compensation which are not the result of delivery 71 to 182 m3 (depending on the building of a defective device from Spartherm Feuerungstechnik GmbH are excluded Room heating capacity insulation) and are not part of this warranty promise.
  • Page 26: Declaration Of Conformity

    This facilitates specific troubleshooting and fast rectification of defects. Service Protocol/Checklist: The Service Protocol is for documentation of the maintenance tasks per- formed yearly by a specialised company Commissioning Protocol for Mellino V4_5-____________(Ser. no.) Installation address (customer): Name: Adress: Postcode: City: Tel.:...
  • Page 27 At delivery: Service Protocol for Mellino V4_5-____________(ser. no.) Maintenance tasks executed yearly in accordance with 4.11: View pane of the combustion chamber door undamaged Cladding undamaged Date Company / signature Comments Accessories complete according to the scope of delivery specification...
  • Page 28 IT Il vostro rivenditore specializzato | E Sus comercios especializados NL Uw vakhandelaar | PL Państwa sprzedawca | РУС Ваш дилер SPARTHERM Feuerungstechnik GmbH · Maschweg 38 · D-49324 Melle Phone +49 (0) 5422 94 41-0 · Fax +49 (0) 5422 9441-14 · www.spartherm.com GB 28...

Table of Contents