Indoor Unit - Mitsubishi PE-10MYC Data Book

Pe(h) series air-cooled split-type ducted air conditioners
Table of Contents

Advertisement

PUH-15, 20
(1) At a single installation
The obstacle is on the outlet side. (Fig 1)
The obstacle is in four directions. (Fig 2)
The obstacle is in three directions. (Fig 3,4)
ceiling
Fig 1
However, the outlet side must be opened.
300 over
Service-panel
Fig 3
(2) Relation of unit when many set up unit. (Fig 5,6,7)
Service-panel
500
over
300 over
Service-panel
Fig 5
300 over
2. Preparation before installing

Indoor unit

Please use the specified hanging bolt in any case.
Hanging bolt is local supply.
Please use the method below or use the angle and the
rectangular lumber, etc. and install the hanging bolt.
1500
over
The right and left side
and the back and forth
side must be opened.
300 over
500 over
If this side is
service panel, you
need 500 over.
If this side is inlet,
300 over
you need 300 over.
A
A
Fig 7
All "A" is 500 over in any case.
300 over
Service Panel
Fig 2
Fig 4
A
A
Fig 6
All "A" is 500 over.
A
300 over
Insert etc
100-150kg
- 90 -
However, outlet side
must be opened.
500 over
And the obstacle in
300 over
two directions must be
lower than the unit.
300 over
Service-panel
500 over
A
A
If this side is
service panel, you
need 500 over.
If this side is inlet,
you need 300 over.
Reinforcement
Hanging bolt
M10 (PEH-5,PE(H)-7,8,10)
M12 (PE(H)-15,20)
If this side is
service panel, you
need 500 over.
If this side is inlet,
you need 300 over.