Chapter 4 Electrical Installation: Wiring And Grounding; Wiring - BenQ PM200M00 Installation Manual

Solar photovoltaic modules (iec, etl)
Hide thumbs Also See for PM200M00:
Table of Contents

Advertisement

Chapter 4 4 4 4 Electrical Installation: Wiring
Chapter
Chapter
Chapter
Electrical Installation: Wiring
Electrical Installation: Wiring and
Electrical Installation: Wiring

4.1 Wiring

DO NOT do any change or adjustment on the cable of Junction Box.
DO NOT disconnect cable by yourself!
IMPORTANT
IMPORTANT
IMPORTANT
IMPORTANT
The cable must not be bent or crushed on the direct exit of the cable screw joint. A minimum
bending radius r≥4x (static steady), r≥5x (dynamic) cable diameter must be maintained. The
cable must be routed in a way that tensile stress on the conductor or connection(s) is
prevented.
Pay attention to the following when wiring:
1. 1. 1. 1.
Correct wiring scheme
Correct wiring scheme
Correct wiring scheme
Correct wiring scheme
Check that the wiring is correct before commissioning the system. If the measured open
circuit voltage differs from the specifications, then there is a wiring fault. Ensure that the
polarity is correct.
2. 2. 2. 2.
Correct DC plug connec
Correct DC plug connec
Correct DC plug connec
Correct DC plug connection method
Make connections only in dry conditions. Ensure that connections are secure and tight.
3. 3. 3. 3.
Use correctly rated materials
Use correctly rated materials
Use correctly rated materials
Use correctly rated materials
Use PV rated solar cable for wiring and suitable connectors only. Ensure that they are in
perfect electrical and mechanical condition. Use only single wire cables. Select a suitable
conductor diameter to minimize voltage drop.
2013/7/25
Figure 4 4 4 4 Minimum bending radius of cable
Figure
Figure
Figure
tion method
tion method
tion method
11
and Grou
and
and
Grounding
Grou
Grou
nding
nding
nding

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pm245p00Pm250m01Pm300p00Pm318b00Pm318b01Pm096b00

Table of Contents