Mx-Rbx1, Mx-Fnx2 - Sharp MX-2300 G Installation Manual

Digital full color multifunctional system
Hide thumbs Also See for MX-2300 G:
Table of Contents

Advertisement

: Dec. 15 2005
1

[8] MX-RBX1, MX-FNX2

MX2700N
1. Unpacking the MX-RBX1
A. Removal of the interface pass unit
B. Removal of the fixing tape
1)
Remove the fixing tape.
C. Check the packed items
1)
1
No.
1
2
3
4
5
6
7
8
2. Installing the MX-RBX1
<Note before installation>
* Before starting installation, check to insure that the data lamp on
the operation panel does not light up or blink.
A. Turn off the power of the main unit
1)
2)
MX-2300/2700 N/G MX-RBX1, MX-FNX2 8 – 1
Check that all the items are included in the package.
1
2
4
5
6
Packed part names
Right cover plate
Interface left cabinet
Reverse tray
Fixing screw A
Fixing screw B
Ornamental screw
Reverse detection actuator
Stopper
Turn OFF the power switch on the operation panel.
Open the front cabinet.
Turn OFF the power switch in the front cabinet of the main unit.
3
7
8
Quantity
1
1
1
6
1
1
1
1
OFF
OFF
OFF

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mx-2700 gMx-2300 nMx-2700 n

Table of Contents