Installing the Edge Switch

This chapter describes tasks required to install the Edge Switch. Some of the topics it covers include:
• Installation
• Installation
• Unpacking and inspecting the Edge
• Installing the Edge Switch on a table or
• Installing the Edge Switch in a

Installation options

The Edge Switch is installed in one of two configurations:
Table or desktop—One or more switches can be installed at the customer facility on a desk or
table top.
Customer-supplied equipment rack—One or more switches can be installed in a
customer-supplied equipment rack. Rack-mount hardware is provided in the shipping container.
NOTE:
LAN addressing issues.

Installation requirements

Ensure that the following requirements are met prior to Edge Switch installation:
A site plan is prepared, configuration planning tasks are complete, planning considerations are
evaluated, and related planning checklists are complete. Also insure that Fabric and device
connectivity are evaluated, and the related planning worksheet is complete. See the HP
StorageWorks SAN high availability planning guide for more information.
Browser-capable PC and Ethernet connectivity are available to support Edge Switch
management through the HAFM Basic interface.
Support equipment and personnel are available for the installation.
The required number and type of fiber-optic jumper cables are delivered and available. Ensure
that the cables are the correct length with the required connectors.
Remote workstations or (optional) SNMP workstations are available. (Workstations are
customer-supplied and connected through a corporate or dedicated LAN.)
Verify that the following items are present before beginning installation:
(Optional) An HP 9000, HP 10000, HP 11000, HP M-Series, HP rack system/e, or an
industry-standard 19-in rack.
Torque driver with cross-tip bit (for setting 22 in./lb. of torque).
options, page 21
requirements, page 21
rack, page 23
When using either configuration, you must consider Ethernet cabling, distance, and
Switch, page 22
desktop, page 22
Edge Switch 2/12 installation guide
21

Advertisement

Table of Contents
loading

Table of Contents