Samsung SGH-U900 Service Manual page 35

Hide thumbs Also See for SGH-U900:
Table of Contents

Advertisement

Exploded View and Parts List
7-2. Assembly
1
1) Put the main LCD in window frame.
※ Caution
1. First, put the main LCD part in window frame.
Main LCD consists of display part and PBA part.
Red dashed lines point to display part.
3
1) Assemble touch key FPCB to connector.
※ Caution
1. Assemble touch key FPCB to connector
(dashed line).
2. Locate connector so that white silk lines
aligned.
This Document can not be used without Samsung's authorization
SAMSUNG Proprietary-Contents may change without notice
2
1) Put the lower bottom to right position.
※ Caution
1. Insert lower bottom to LCD ASS'Y.
2. First, match window side then lean toward PBA
side.
3. Lean the lower bottom until it sound undertone.
4
1) Combine camera.
※ Caution
1. Connect camera FPCB to connector(dashed line).
2. Keep white silk line aligned.
3. Assemble by CIF camera/speaker/5MEGA
camera order.
7-5
Lower Bottom

Advertisement

Table of Contents
loading

Table of Contents