Download Print this page

Installation Instructions - GE Shabbos Keeper Installation Instructions Manual

Advertisement

INSTALLATION INSTRUCTIONS

READ ALL INSTRUCTIONS BEFORE INSTALLING THIS PRODUCT
WARNING
1. Remove the Shabbos Keeper module,
communication cable, and the attachment
strips from packaging.
Communication
Cable
3. Plug one end of the communication cable
into the Shabbos Keeper.
Rev A002
Read all installation instructions before installing this
product. Failure to follow these installation instructions may result
Module
Attachment
Strips
2. Carefully apply two of the adhesive
attachment strips onto the back of the product,
on the left and right sides as shown. Firmly
hold the strips on for at least 30 seconds.
4a. For Back Control Units Only:
Insert the other end of the communication cable into
the range communication port. You may need to pull
the appliance away from the wall to access the port.
Communication Port
Location (Right Side)
Attachment
Strips
View of
Communication Port
4

Advertisement

loading