D20E Ethernet I/O Module
Chapter 2: Installing the D20E
Module
Required tools and materials
D20E ETHERNET I/O MODULE INSTRUCTION MANUAL
Installing the D20E Module
This chapter covers the following topics:
•
Required tools and materials
•
Installation process
on page 36
Before beginning the installation procedures, have the following tools and equipment
available:
•
Flathead screwdriver with 0.6 x 3.5 mm blade (for terminal block wiring)
•
#2 Phillips screwdriver (for rack mounting the unit)
•
Wire cutters (for field wiring)
•
Wire strippers (for field wiring)
•
Wire crimping tool (for field wiring)
•
Tie-wraps (for organizing wiring and cables)
•
Multimeter (for testing voltages and I/O points)
•
Needle nose pliers
on page 35
GE INFORMATION
35