23.2. CONTROL UNITS IN A NETWORK

The EBL512 G3 system can be build up as a single TLON Network or as a redundant network, which means two networks.
In the single TLON Network, one TLON connection board (5090) has to be plugged in each control unit.
This network will be Network no. 0.
In the redundant network, two network boards (5040/5090) have to be plugged in each control unit. The redundant network supports
full functionality also in case of a network fault, for example open circuit or short circuit in one of the networks. In this case there will
be a Primary network (Network no. 0) and a Secondary network (Network no. 1).

23.2.1. 5040 NETWORK

a) Mount two network boards 5040 on the main board.
b) Connect the network cables to the networks board.
c) For each control unit, repeat procedure
d) When all control units are powered, do the programming in EBLWin.
e) For each control unit, set the control unit ID according to
After the control unit ID has been set, each control unit will automatically restart and start using the new ID.
f) Download the SSD.

23.2.2. TLON NETWORK

a) Mount the TLON connection board on the main board.
b) Connect the network cables on the main board, terminal block "J4".
c) For each control unit, repeat procedure
d) When all control units are powered, do the TLON Network programming in TLON Manager. Include only the control units that
shall be connected now, see Planning Instructions for this system.
e) Install the TLON Network.
f) Download the SSD.
If you know that one or more of the control units are to be started-up later, do as follows:
In EBLWin or TLON Manager, do the TLON Network programming only for the control units that shall
be connected now.
Create an SSD only for the control units that shall be connected.
Always wait to download the SSD until the TLON Network installation is ready.
Later, when one or more control units shall be added to the TLON Network:
Open the project in TLON Manager, add the new control unit(s) and install (download) according to the
separate Technical description TLON Manager Kit MEW01983.
Open the SSD in EBLWin and add the new control unit(s) and download the SSD to all control units.
23.1. SINGLE CONTROL UNIT
17.3.8 SET CONTROL UNIT ID
23.1. SINGLE CONTROL UNIT
78
on page 77, step a) to f).
in Planning Instructions for this system.
on page 77, step a) to f).

Advertisement

Table of Contents
loading

Table of Contents