GE BAKER HUGHES Masoneilan SVi 1000 Quick Start Manual page 85

Table of Contents

Advertisement

Replacement of the Main electronics board, Basic, Switch and Position Retransmit Terminal
boards, Housing cover kit, pressure gauges, I/P assembly and Integral magnet assembly are
the only field repairs permitted.
Upon completion of part replacement, ensure all retaining screws are securely tightened, all
"O" rings are in place and not damaged, and all wires are securely connected.
When installing the main cover ensure the gasket is seated in the cover flange groove, the
flange area is not corroded and the surface is not scarred and that no wires can be trapped
under the cover flange. Ensure the four cover bolts screws are secure by applying 17.7±1.77
in-lbs or 2.0±0.20 N*m.
For assistance, contact the nearest sales office, your local representative or email
svisupport@ge.com. Visit our web page at
Maintenance Connection
The electronics module is protected by a plastic snap on cover. A keyed eight position connector
resides under the cover. This interface is only used during manufacturing, repair or overhaul. It
is not intended for field use and has been designed to prevent connection to field wiring. It is
not intended for customer use.
Copyright 2018 as an unpublished trade secret. This document and all information herein is the property of Dresser LLC. It
is confidential and must not be made public or copied and is subject to return upon demand.
© 2019 Baker Hughes, a GE company, LLC. All rights reserved.
ES-761 Rev H
www.ge-energy.com/valves
Page 13 of 13
Masoneilan SVi1000 Positioner Quick Start Guide =| 85
GE Oil & Gas

Advertisement

Table of Contents
loading

Table of Contents