Test Completion - GE Dash Port 2 Service Manual

Table of Contents

Advertisement

Test Completion

4-12
Maintenance: Electrical Safety Tests
9. Read the current leakage indicated on DMM.
127(
If the reading is greater than the specification below, and the
device under test is powered from 100-240 V/50-60 Hz, the device
under test fails. Contact GE Medical Systems Information
Technologies Technical Support.
100 microamperes (0.1 volts on the DMM), and the device under
test is powered from 100-240 V/50-60 Hz
Disconnect all test equipment from the device. Disconnect the device
power cord plug from the leakage tester power receptacle. Disconnect the
leakage tester from the wall receptacle.
Dash Port 2 Docking Station
2000966-138
Revision A

Advertisement

Table of Contents
loading

Table of Contents