Download Print this page

Toro Greensmaster 3200 Service Manual page 175

Hide thumbs Also See for Greensmaster 3200:

Advertisement

Removal (Fig. 89)
1. Before removing any parts from the hydraulic sys-
tem, park machine on a level surface, set brake, lower
cutting units, and stop engine.
CAUTION
Operate all hydraulic controls to relieve sys-
tem pressure and avoid injury from pressur-
ized hydraulic oil. Controls must be oper-
ated with the ignition switch in RUN and the
engine OFF. Return ignition switch to OFF
when pressure has been relieved. Remove
key from the ignition switch.
2. Clean oil filter assembly. Place clean container,
large enough to collect 2 gallons (7.6 liters), under the
oil filter assembly to collect hydraulic oil.
3. Crack open oil filter and allow at least 2 gallons (7.6
liters) of hydraulic oil to drain into the container, then
tighten oil filter to stop drainage. Uncap hydraulic oil tank
and allow enough time for the hydraulic oil to drain out
of the leak detection tank into the hydraulic oil tank.
4. Remove five cap screws and flat washers securing
the cover plate and cap tether to the leak detection tank.
Remove cover plate from tank (Fig. 90).
5. Remove cap screw and flat washer securing R–
clamp and leak detector harness to the underside of the
hydraulic tank. Pull clamp free of harness (Fig. 91).
6. Unplug leak detector harness from 2–pin plug, with
yellow/orange and black wires, on the main tractor har-
ness. Pull leak detector harness out of the access hole
on the hydraulic tank.
7. Loosen four cap screws securing the valve assem-
bly to the fill neck on the hydraulic tank. Lift leak detec-
tion tank from the hydraulic tank. Remove O–ring from
fill neck boss (Fig. 91).
Installation (Fig. 89)
1. Top off main hydraulic tank until fluid is visible at
base of breather port. This will ensure that the maximum
amount of air is purged from the main tank before instal-
ling the leak detector.
2. Make sure filler screen is placed in neck of auxiliary
tank.
3. Make sure five capscrews and washers securing
the cover plate to auxiliary hydraulic tank are removed
with the cover plate (Fig. 90).
Greensmaster 3200/3200–D
4. Clean mating surfaces of block and fill neck with a
clean, dry rag. Carefully place new O–ring over fill neck
boss (Fig. 91).
5. Route wire harness through access hole in hydrau-
lic tank. Align valve assembly with fill neck. Secure valve
to hydraulic tank fill neck with four capscrews (Fig. 91).
3
5
1.
Cap screw
2.
Flat washer
3.
Cover plate
9
11
4
5
3
1.
Cap screw
2.
Flat washer
3.
R–ring
4.
Leak detector harness
5.
Hydraulic tank
6.
Cap screw
Page 5 – 103
1
2
Figure 90
4.
Cap tether
5.
Leak detection tank
12
10
8
2
1
Figure 91
7.
Valve assembly
8.
Fill neck
9.
Leak detection tank
10. O–ring
11. Plug
12. Sight gauge
Hydraulic System
4
6
7
1

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Greensmaster 3200-d