TEST‐RUNNING THE MACHINE
Test‐running this machine can ensure good machine performance in the future. We suggest you run
the following tests on the machine before first use:
Testing machine performance:
Turn on the power and run a basic performance test after you finish installing the machine. Follow
these steps to test machine performance:
Step 1 – Disassemble shipping brackets and bolts.
Step 2 – Install roller table (optional).
Step 3 – Turn on the relay switch in the control box.
Step 4 – Elevate the saw bow. (If your coolant pump is in reverse and the machine cannot run, please
change the electrical phase.)
Step 5 – After the saw bow ascends, extend the quick approach device.
Step 6 – Remove the rust‐prevention grease with cleaning oil or kerosene.
Step 7 – Start the coolant pump.
Step 8 – Test these functions under manual mode:
vise clamping/unclamping
saw bow ascending/descending
feeding forward and backward
4‐26