Pneumatic Schematic Dia- Gram - Bosch Start Line TCE 420 Repair Instructions

Tyre changing machines
Hide thumbs Also See for Start Line TCE 420:
Table of Contents

Advertisement

Available languages

Available languages

!
Forbid to inhale, swallow, splash in eye, contact
skin and so on.
Fire-fighting equipment usage
Solid matter
Water
YES
Foam
YES
Dry powder
YES*
CO2
YES*
*) all the material must be used by the professional
firefighter.
i
The fire material information in the above form
just pro- vides the basic guideline for users. Please
contact the professional fire control institutions to
get the detail guide.
Robert Bosch GmbH
Pneumatic schematic dia- gram | Start Line TCE 420 | 39
Liquid subs-
Electrical
tance
equipment
NO
NO
YES
NO
YES
YES
YES
YES
8.
Pneumatic schematic dia-
gram
Ref.
Designation
Air treatment components
1
Water separator
2
Reducing valve
3
Atomized lubricator
Control air circuit for cross arm locking
4
Pedal valve for vertical column
5
Locking cylinder for square shaft(back)
6
Locking cylinder for hex shaft
7
Throttle valve
8
Locking cylinder for square shaft(front)
Control air circuit for tilt cylinder
9
Pedal valve for tilt cylinder
10
Tilt cylinder
Control air circuit for turntable
11
Pedal valve for turntable
12
Air guider
13
Turntable cylinder
Control air circuit for bead break cylinder
14
Pedal valve for bead break cylinder
15
Bead break cylinder
16
Exhaust valve
Control air circuit for inflation
17
Reducing valve
18
Inflator
en
|
1 695 108 084
2016-11-15

Advertisement

Table of Contents
loading

Table of Contents