LG Styler S3RERB Service Engineering Manual page 90

Hide thumbs Also See for Styler S3RERB:
Table of Contents

Advertisement

12-24. Problem with Drying #1
Do you hear noise from the comp 30 - 60 seconds
after turning on the power and starting the Drying
course?
YES
Does the pipe temperature rise to 60 - 70  10 minutes after starting the
 Check the temperature during operation.
YES
Is the coil of LEV properly assembled?
YES
Is the connector related to LEV properly assembled?
LEV connector (WH5), main PCB connector (NA5)
Drying course?
NO
Check the connection of related harness connectors.
Comp connector (WH3), main PCB connector (RD3)
NO
NO
NO
90
Check if the thermistor is properly
assembled.
Assemble the coil properly.
Connect the connector.

Advertisement

Table of Contents
loading

Table of Contents