Setup the Power Measuring Unit
STEP2
19
Power Measuring Unit registration complete.
Here we confirm that the measurements being taken look correct.
If an abornal value is shown,tap the "In event of an abnormal value"
button to restart the process for Step . If PV is installed, negative
value is displayed while generating.
A storage battery will display as a positive number while charging
and negative while discharging.
If incorrect figures are displayed
* Re-check the direction of the CT
* Check that CT1 is connected to V1,
CT2 to V2 and CT3 to V3.
Tap the "Everything is normal" button.