Lay Out And Inspect Panels; Install Base Channels - GE Monogram ZWVS1000SR Installation Instructions Manual

Wine vault
Hide thumbs Also See for Monogram ZWVS1000SR:
Table of Contents

Advertisement

INSTALLATION INSTRUCTIONS

LAY OUT AND INSPECT PANELS

Panel sizes vary. Assemble the wine vault
panels in the positions shown. Corner
panels are interchangeable.
INSTALL THE BASE CHANNELS
Thoroughly clean the floor surface where the vault
is to be installed.
Step 1:
Locate the three ceiling panels. Lay the
panels on the floor, top surface up. Align
the outside edges of the panels and pull
the panels tightly together.
Mark a line on the floor that is 1/2"
outside the ceiling panels. The line will
indicate the location of the outside
edges of the base channels of the vault.
Carefully remove the ceiling panels and
set aside for later installation.
8
"
4 6
"
1 / 2
3 4
1
/
"
2
Holes for
Ceiling Lights
Hole for Power Cord
FRONT
"
2 3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Monogram zwvt1000sr

Table of Contents