Bosch BCC50 User Manual page 20

Table of Contents

Advertisement

App Menu Overview
Need
Screen
Schedule
To add a new Schedule, use the '+' button in the top right
u
hand corner, name your schedule and click OK.
To modify an existing Schedule, select a Schedule from the
u
list and click Next.
38
Need
Need
Screen
Screen
Add a New Period
Edit an Existing Period
To add a new Period to a
To edit an existing Period,
given day, click the Add
click on the Starting, Heat or
Period button in the middle
Cool value you would like to
of the screen and then
edit and use the scroll wheel
individually select and set
to update the value.
Starting time, Heat setpoint
and Cool setpoint.
App Menu Overview
Need
Need
Screen
Screen
Delete an Existing Period
Copy a Schedule
To delete an existing period,
To copy a schedule to other
swipe left on the existing
days of the week, click the
period and click delete.
lettered days at the bottom of
the screen until all days you
would like to copy the existing
schedule have turned green
and click Copy Schedule.
Need
Screen
Save Schedule
Use the Save button in the
top right hand corner of the
screen to save all changes.
39

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents