Download Print this page

Maintenance - LG CHEM RESU10H Owner's Manual

Lithium-ion storage battery
Hide thumbs Also See for CHEM RESU10H:

Advertisement

GENERAL
The Solahart Battery system has been designed for minimal and easy maintenance.
For recommended maintenance of the PV system, refer to the Solahart Owner's Guide for PV systems.
RECOMMENDED MAINTENANCE SCHEDULE
Maintenance Action
If you have an internet connected system,
log in to your Inverter manufacturer's web
portal and check that your system is
operating, data has been logged and
communication
has
Ensure that the contact details of the PV
system owner or responsible officer are up
to date to ensure that Inverter fault
notifications are delivered.
Clear leaves and other debris from the top
edge of the Battery if installed outside
Ensure Battery System is connected to the
grid and switched on.
If
applicable,
check
functionality.
Clean the exterior of the Battery with a soft,
lint-free cloth. The cloth can be dampened
with only water if needed. It should not be
dripping.

MAINTENANCE

Frequency
Monthly
been
maintained.
Quarterly
backup
circuit
required
Remarks
If you are unable to log in or your system is not
operating correctly, contact your Solahart
dealer.
Maintains optimal airflow through the Battery.
Prevents Battery discharge below acceptable
limits.
Yearly
Contact your local Solahart dealer to arrange
for a check up.
When
Do NOT use cleaning solvents to clean the
Battery.
10

Hide quick links:

Advertisement

loading