Power Off Procedure - Bosch DVA-08K Installation Manual

Raid subsystem scsi premium series
Hide thumbs Also See for DVA-08K:
Table of Contents

Advertisement

36
en | Subsystem Connection and Operation
5.5

Power Off Procedure

If you wish to power down the subsystem, please follow these steps:
NOTICE!
i
If you wish to power down the subsystem, please ensure that no time-consuming processes,
like "Regenerate Logical Drive Parity" or a "Media Scan," are running.
1.
2.
3.
4.
F.01U.027.797 | V1 | 2006.05
DVA-08K
DVA-08K
Stop I/O access to the system
Stop all I/O accesses from the host computers to the subsystem. Please refer to the
related documentation of your host applications and operating system.
Disconnect the host
The host must be disconnected from the subsystem. To do this, disconnect the cables
from both the host and the subsystem.
Flush the cache
Use the "Shutdown Controller" function to flush all cached data. This prepares the RAID
subsystem to be powered down.
Turn off the power
Turn off the power switches at the power supply modules. Once the RAID subsystem has
been powered down, other devices that are connected to the subsystem can be powered
down.
RAID Subsystem DVA-08K | Installation Manual
Verifying installed cache memory.
System is ready. You can now start to config-
ure the subsystem.
Bosch Security Systems

Advertisement

Table of Contents
loading

Table of Contents