Download Print this page

CCL SUL100 Operation & Maintenance Manual

Sentry ul battery charger

Advertisement

Quick Links

c i 0 0 3 0

Advertisement

loading

Summary of Contents for CCL SUL100

  • Page 1 c i 0 0 3 0...
  • Page 2: Warning - Risk Of Explosive Gases

    Connections to battery charger should comply with all local codes and ordinances. SUL100 & SUL120 - These battery chargers should be installed so that they are not likely to be contacted by people. ESUL100 & ESUL120 - The AC wiring should be independent of the DC and alarm wiring. Use AWG#12 or larger wre for DC (charger to battery)leads.
  • Page 4: Current Limiting

    SAVE THESE INSTRUCTIONS OPEN FRAME MODELS - Fixing Holes Fixing Holes SUL100 & 120 - 98.8mm / 3.9" ESUL 100 & 120 - 66mm / 2.6" SUL100 & SUL120 The charger must be mounted as shown in Figure 2a. Four screws should be used to mount charger to panel. Ensure screws are tightened firmly as as not to become loose during normal use on engine.
  • Page 5: Terminal Connection Information

    IMPORTANT OPERATING INSTRUCTIONS - SAVE THESE INSTRUCTIONS Before operating the battery charger, ensure that the charger is assembled and installed as per the section listed in these instructions. Terminal Connection Information OUTPUT INPUT CHARGE FAIL BOOST Output: To battery CAUTION: Observe correct polarity Input: AC supply CAUTION: Observe correct voltage as stated on unit...
  • Page 6: Troubleshooting Flowchart

    TROUBLESHOOTING FLOWCHART START HERE PROBLEM SOLVED Are batteries charging? MEASURING CHARGING VOLTAGE AND CURRENT To check charger is working, follow these steps then consult expected conditions for relevant battery type below. CHARGER BATTERY (1) VOLTAGE - Place voltmeter across battery terminals (V on fig ii) (2) CURRENT - Break the positive line to the battery and place an ammeter between positive from charger and positive of battery (A on fig ii) Figure (ii)

This manual is also suitable for:

Sul120Esul100Esul120