Page 1
INSTALLATION INSTRUCTIONS READ & SAVE THESE INSTRUCTIONS! VacPan Automatic Dustpan Inlet ™ MODEL: CI-365 READ INSTRUCTIONS BEFORE INSTALLATION IMPORTANT NOTES: 1. For maximum clearance under cabinets use 2 " X 3 " short 90° elbow. 2. Check for an air tight seal at VacPan™ and elbow prior to installation. 3.
Page 2
INSTALLATION OPTION #1 - UNDER CABINET ACCESS TO PIPING FROM BELOW Refer to Figure 2 1. Select a location under cabinet for VacPan™ (6) so that new fittings can be connected to existing pipe. Drill small reference hole under location of VacPan™ to determine position in basement or crawl space. 2.
Page 3
INSTALLATION OPTION #2 - IN WALLS ALONG BASE BOARDS Refer to Figure 3 (ACCESS TO PIPING FROM BELOW) 1. Locate studs (1) in the wall at the location VacPan™ will be installed. 2. VacPan™ should be located tight to one side in stud space. 3.
Page 4
INSTALLATION NEW HOME CONSTRUCTION Refer to Figure 5 1. Cut out wall plate (9) between two studs at the location of VacPan™. Cut a 6 3/4" piece of wall plate and refasten to floor temporary rough-in block. (10) This will act as temporary rough-in block that will force all trades to finish around providing a slot in wall for installation of VacPan™.