1. Please read this installation instructions carefully before proceeding.
2. Thoroughly inspect the product and components, contact our support team with
damaged or missing components for a replacement, return or repair.
3. Consult local building codes to ensure the installation complies with standards in your area. The warranty will be void if
the product is installed with a conspicuous defect.
4.We recommend a flow rate no greater than 12 GPM for use with this product. The load-grade allow pedestrian walking only.
5. The information provided in this instruction are general guidelines and a licenced professional should always be used
during installation.
Grating and Parts
Three styles of stainless steel grating options available:
Stainless strainer / Hair catcher
2
Protective fabric
3
Drain body / Channel
Leveling feet / 2 PCS
4
( *12" do not use leveling feet.)
5
Threaded adaptor / Height adjustable
6
Grate & strainer lifting hook
Preparation
The substrate should be smooth, level, clean and free of all dirt, oil, laitance, paint, concrete sealers or curing compounds.
Dry dusty concrete slabs or masonry should be dampened and excess water swept off.
The following tools and materials maybe needed: Hole Saw, Crescent Wrench, Level, Utility Knife, Ruler or Tape measure,
Pencil, Notched Trowel, Weep protectors, Silicone, Solvent Cement.
For the traditional type of waterproofing, the professional should build a shower pan in the wet /shower area with PVC, Vinyl, Lead
or Fiberglass material, then the drain usually connect to the waste line with a mechanical clamp down drain flange (drain base), some
model do not include such flange and need separately purchase before installation.
support @neodrain.com to
(NOTE : Pedestrian loading only.)
Please be sure to read carefully before installation.
report any

Advertisement

loading
Need help?

Need help?

Do you have a question about the ZA3-24-T02-GD and is the answer not in the manual?

Questions and answers

Summary of Contents for Neodrain ZA3-24-T02-GD

  • Page 1 CA 2022.4 1. Please read this installation instructions carefully before proceeding. 2. Thoroughly inspect the product and components, contact our support team with support @neodrain.com to report any damaged or missing components for a replacement, return or repair. 3. Consult local building codes to ensure the installation complies with standards in your area. The warranty will be void if the product is installed with a conspicuous defect.
  • Page 2 Site & Placement Whether for a renovation or new construction, choosing the drain location is contingent on the waste line location, which may be predetermined or already installed. Moving a waste line may bepossible, depending on site conditions. Tile insert process If you don't buy Tile-insert design, just skip to next page.
  • Page 3 Installation The following installation details do not cover every possible situation, some may not be appropriate for DIY. Always consult with licenced professional during installation. MORTAR Slope Dustcloth SUB FLOOR SUB FLOOR Side View Installation Step: 1. Coupling the drain base outlet to 2" or 3" schedule 40 DWV pipe using correct solvent cement. 2.
  • Page 4 All reasonable care have been taken in compiling the information in this document. All recommendations and suggestions on the use of Neodrain products are without guarantee since the conditions of use are beyond the control the Company. It is the customer’s responsibility to ensure that each product is fit for its intended purpose and that the actual conditions of use are suitable.

This manual is also suitable for:

Za3-12-t02-gdG03Za3-18-t02-gdZa3-28-t02-gdZa3-32-t02-gdZa3-36-t02-gd ... Show all