Lifting The Machine - JUNTTAN PM 20L Operator's Manual

Table of Contents

Advertisement

JUNTTAN
Daily operation section
6.8.5

LIFTING THE MACHINE

Always use the indicated lifting points when lifting the machine, see picture below.
Maximum leader length 12.6 m is shown in the figure. Check center of gravity line
position before start lifting.
13800
89

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PM 20L and is the answer not in the manual?

Table of Contents

Save PDF