Troubleshooting
Q PSU present LED not lit.
A Check mains supply ok.
A Check thermistor ok.
Q Battery Present LED not lit.
A Check battery wiring/fuses.
Q Battery low LED lit.
A Battery is low, disconnected, or has failed battery test.
Q Battery Low LED flashing.
A Battery is charging normal operation.
Q Battery Low LED is out.
A Battery is charged.
Q Charger status contacts have not changed state (initial power up).
A Thermistor fault.
Q Battery test button has been pressed no battery test has occurred.
A Is battery low flashing (unit only test batteries when charged)
Safety instructions
a.
The PSU must be reliably connected to earth.
b.
In accordance with IEC415 No.5017, a label showing the protective earth symbol should be placed
adjacent to the installation earth.
c.
A suitable disconnecting device should be installed by the end user.
The secondary outputs are considered for connection to SELV circuits only.
The maximum leakage current of the final equipment should not exceed 3.5mA under normal operating
conditions.
Installation
The unit should be installed to allow adequate airflow through the unit.
Do not cover the ventilation slots in the unit cover.
Warning Symbols
Danger - Hazardous voltage inside.
Contact will cause shock or burn.
Turn off and lockout system power before servicing.
Caution - Hot surface
Contact with internal components during servicing may be hot.
VxI Power Limited
Station Road, North Hykeham, Lincoln, LN6-3QY, UK
Tel: +44 (0)1522 500511 Mail: mail@vxipower.com
www.vxipower.com
Design, Manufacture
& Supply of
Power Related Products
ORACLE III 200W BATTERY BACKED PSU/CHARGER
Introduction
This application note is intended for use by installers, or by new customers evaluating sample units. It is a guide to
the main functionality of the Oracle 200W unit, and demonstrates the main features.
Connection sequence
When connecting unit ensure all other connections are made before connecting the battery. Only then should AC be
applied to the unit.
AC MAINS
INPUT
AC Mains Input
Mains input is via a 5 way Weidmuller Klippon connector.
The unit is auto-ranging over the input range 85-264V AC RMS, 50/60Hz.
Where installed in a system cabinet, the PSU's earth conductor should not be used as the overall system earth.
Cabinets should have supplementary earth bonding in accordance with the installed equipment.
14699-020A R2
INSTALLATION MANUAL
(Inc. RS232 derivatives with manual battery test button)
www.vxipower.com
PSU's, Chargers, AC-DC Converters,
Turnkey Enclosures & Batteries,
Custom Design Solutions
BATTERY &
MAIN O/P'S
VOLT FREE
CONTACTS
SERIAL PORT
(RS232 OPTIONAL)
THERMISTOR
AUXILIARY
OUTPUT
(OPTIONAL)

Advertisement

loading

Summary of Contents for VXI ORACLE III

  • Page 1 Q Battery Present LED not lit. A Check battery wiring/fuses. INSTALLATION MANUAL ORACLE III 200W BATTERY BACKED PSU/CHARGER Q Battery low LED lit. A Battery is low, disconnected, or has failed battery test. (Inc. RS232 derivatives with manual battery test button) Q Battery Low LED flashing.
  • Page 2 Serial Communications (Optional) For units fitted with the serial comms option please see the applicable VXI application note for further Initiation of battery test can be implemented either through software, or by pressing the test button on the side of the unit.

This manual is also suitable for:

Oracle iii-200