Page 2
TOOLS & MATERIALS NEEDED 2” Screws Kitchen & bath Silicon Caulk Level Stud Finder Pencil Toggle Bolts 1/8” bit (Provided) Power Drill with Screw Bit 1/2” bit Gloves Tape Measure Philip Screw Driver A: ASSEMBLE MAIN BODY #2. Screw in the long black screws to all applicable places #1.
Page 3
#6. Place the 3 remaining strips #7. Line up the other side #5. Place side panel into into positions on the side panel panel and put into position position with the base #8. Insert Cam locks into all their holes #9.
Page 4
#12. Place the two back walls of #13. Place one side wall #14. Place the other side the top shelf into place of shelf into place wall of the shelf into place #16. Insert Cam locks into all #17. Put the “U” gasket in #15.
Page 5
#20. Place the back wall of the shelf #21. Place one side wall #22. Place the other side wall of shelf into place into place of the shelf into position #24. Insert Cam locks into all their holes #23. Place the shelf box onto the and turn clockwise to secure into place front panel D: INSTALL DRAWER RAILINGS...
Page 6
E: INSTALLATION- MOUNT THE VANITY ON THE WALL Step 1. Use a level to mark the Step 2A. Remove 2 drawers Step 2B. While the cabinet is holding height of the cabinet to be mounted then lift and hold the cabinet in place, use a 1/8”...
Page 7
C. Holes on bottom sides of drawer will go into the bolts sticking up from railings *This manual is intended for assembly and installation of the vanity cabinet only. XtremeAIR is not responsible for anything that may arise from plumbing or faucet. Page 7...