Download Print this page

FITOK HPT-DF Instruction Manual

Hydraulic presetting tools

Advertisement

Quick Links

FITOK Group
FITOK GmbH
Sprendlinger Landstr. 115, 63069 Offenbach am Main, Germany
Tel.: +49 69 8900 4498
Fax: +49 69 8900 4495
FITOK, Inc.
13843 North Promenade Blvd., Suite 750, Stafford, Texas 77477,
USA
Tel.: +1 281 888 0077
Fax: +1 281 582 4051
FITOK (Wuhan) Incorporated
Zhongbai Yangluo Industrial Park, Hanshi Road, Xinzhou District,
Wuhan, Hubei Province, 430415, China
Tel.: +86 27 8983 8988
Fax: +86 27 8983 8980
FITOK (Shenzhen) Incorporated
No.164 Xinqu Village, Tiantou Community, Shijing Street,
Pingshan District, Shenzhen 518118, China
Tel.: +86 755 2803 2500
Fax: +86 755 2803 2619
FITOK (Suzhou) Metal Products Co., Ltd.
No. 29 Changsheng Road, Yangyuan Industrial Park, Xinzhuang
Town, Changshu, Jiangsu 215562, China
Tel.: +86 512 5247 9001
Fax: +86 512 5247 9002
FITOK Corporation
1F, B1, 119, Gyeonggi-daero 632beon-gil, Osan-si, Gyeonggi-do,
Republic of Korea
Tel: +82 31 831 9811
Fax: +82 31 831 9812
FITOK Middle East Oil Equipment Trading LLC
Makateb Building, P.O. Box 185412, Airport Road, Deira,
Dubai, UAE
Tel.: +971 4 2959 853
Fax: +971 4 2959 854
info@fitokgroup.com
info@fitokgroup.com
www.fitokgroup.com
www.fitokgroup.com
Hydraulic Presetting Tools
(Medium & High Pressure)
Instruction Manual

Advertisement

loading

Summary of Contents for FITOK HPT-DF

  • Page 1 1F, B1, 119, Gyeonggi-daero 632beon-gil, Osan-si, Gyeonggi-do, Republic of Korea Tel: +82 31 831 9811 Fax: +82 31 831 9812 FITOK Middle East Oil Equipment Trading LLC Makateb Building, P.O. Box 185412, Airport Road, Deira, Dubai, UAE Tel.: +971 4 2959 853 Fax: +971 4 2959 854 info@fitokgroup.com...
  • Page 2 WARNING - Proper personal protection equipment must be used when operating the Hydraulic Presetting Tool. CAUTION - Do not tamper with or alter any components. CAUTION - Please contact FITOK Group or authorized distributors if any signs of hydraulic fluid leakage or malfunction occur.
  • Page 3 Bleed valve Operation Pressure gauge Locking handle 1. Prepare tube ends by deburring. Note: Remove any burrs. Use of FITOK Tube Deburring Hydraulic housing Wrench Tool is recommended. 2. Put a nut, a rear ferrule and a front ferrule onto the Base tubing in proper sequence and orientation.
  • Page 4 CAUTION Do not rotate the tubing. 45 47 2. If the die head piston is binding, contact FITOK Group or authorized distributors. 5. Open the bleed valve. Loosen the nut and remove the 3. If the pump fails to build pressure, check the oil level in tubing from the hydraulic presetting tool.

This manual is also suitable for:

Hpt-nHpt-dff8Hpt-dff9Hpt-dff12Hpt-dff16