Download Print this page

Pacific Teak Millworks CH-DO1-18 Installation & Operation Instructions

Premium outdoor room cabinetry

Advertisement

Quick Links

Premium Outdoor Room Cabinetry
INSTALLATION & OPERATION
INSTRUCTIONS

Advertisement

loading

Summary of Contents for Pacific Teak Millworks CH-DO1-18

  • Page 1 Premium Outdoor Room Cabinetry INSTALLATION & OPERATION INSTRUCTIONS...
  • Page 2 All cutout dimensions below are in inches and provide 1/4” total tolerance vertically and horizontally. Be careful not exceed the dimensions shown. Cutout Dimensions Models Width Height Depth CH-DO1-18; AD1-(18S/18C/18LR/ & 18LL) 17.25 21.25 3.25 CH-DO2-30; AD2-(30S/ 30C/ & 30L) 29.25 21.25 3.25...
  • Page 3 Installing Drawers: a. Install Handles on Drawer Fronts and carefully set them aside. b. Place the Drawer or Combo Chassis at a comfortable working height. Take Adjustment Tab care not to damage the beveled fl ange around the face of the chassis. c.
  • Page 4 Adjusting Doors: 33951 Valencia Place Dana Point, CA 92629 info@pacifi cteakmillworks.com www.pacifi cteakmillworks.com IN2 519...

This manual is also suitable for:

Ad1-18sAd1-18cAd1-18lrAd1-18llCh-do2-30Ad2-30s ... Show all