Download Print this page

L&L Kiln Mfg eFL Series Instruction Manual

Advertisement

Quick Links

KILNS BUILT TO LAST
1.
Kiln deliveries are by Common Carrier, are very fragile, and require special treatment by the customer which is often
outside the normal range of experience. We find that preparing ahead and understanding the challenges will help to
make the process go smoothly.
2.
Please fill out this checklist and forward to who sold you the kiln.
3.
L&L will review and will call you directly to confirm the details and discuss any shipping or delivery issues.
4.
Once the kiln delivery situation is clarified and approved by L&L then the order will be confirmed to the reseller, and they
can confirm to you. In some cases, deposits may be required.
5.
The kiln will then be scheduled for production and the current expected lead time will be sent to the reseller.
6.
When the kiln is finished, we will send an email to the seller for approval to ship. Keep this checklist handy for when you
receive the kiln.
COMPANY / INSTITUTION (IF ANY):
CUSTOMER NAME:
ADDRESS:
Physical Street Address for Delivery (Include City/State/Zip Code): (No PO Boxes)
CONTACT PHONE NUMBER:
EMAIL
DISTRIBUTOR / SALESPERSON:
KILN MODEL NUMBER: -eFL1626
ACCESSORIES: -Furniture Kit
Other Options or special modifications: ______________________________________________________________
ELECTRICAL
- 240 Volts 1/Phase
VOLTAGE:
International Only: - 220 Volts 1/Phase
See our electrical specifications to make sure your fuse and amperage available are sufficient. Also – we HIGHLY
1.
recommend putting a meter to your power unless you are absolutely certain of what you have. Many mistakes have
been made by looking at some appliance nearby and assuming that the rating on that is what you have.
eFL Series Order Checklist, Receiving & Assembly Instructions
eFL KILNS – ORDER CHECKLIST
-eFL2026
-Vent System
- 240 Volts 3/Ph
- 380 Volts 3/Phase (Wye)
TITLE (IF ANY):
-eFL2626
-eFL2635
-Vent Control
-Casters
- 208 Volts 1/Ph
REV: 3/13/2022
505 Sharptown Road
Swedesboro, NJ 08085
Phone: 856.294.0077
Fax: 856.294.0070
sales@hotkilns.com
-Genesis Control
-Type S TCs
- 208 Volts 3/Ph
Page 1 of 8
L&L Kiln Mfg. Inc.
hotkilns.com

Advertisement

loading

Summary of Contents for L&L Kiln Mfg eFL Series

  • Page 1 Many mistakes have been made by looking at some appliance nearby and assuming that the rating on that is what you have. eFL Series Order Checklist, Receiving & Assembly Instructions REV: 3/13/2022...
  • Page 2: Placement & Location

    To ensure the kiln room does not overheat, see the General Dimension Drawing for BTU specifications. These are available on each model’s webpage. See hotkilns.com/calculate-kiln-room-ventilation for more information. • See the Vent-Sure instructions for more information. eFL Series Order Checklist, Receiving & Assembly Instructions REV: 3/13/2022 Page 2 of 8...
  • Page 3 And that they understand the conditions under which the kiln is being delivered. Customer Signature: ________________________________________________ Date: _____________________ PLEASE RETURN THIS CHECKLIST TO YOUR RESELLER, OR TO SALES@HOTKILNS.COM IF BUYING DIRECT. eFL Series Order Checklist, Receiving & Assembly Instructions REV: 3/13/2022 Page 3 of 8...
  • Page 4 Make your notations as specific as possible to protect if concealed damage is subsequently discovered. (In some cases, the shipper may not allow you to do that). See hotkilns.com/shipping for full policy. eFL Series Order Checklist, Receiving & Assembly Instructions REV: 3/13/2022...
  • Page 5 Rentable at typical equipment rental places, depending on your location, such as Home Depot or Sunbelt, whom we have no affiliation with - see more here: https://www.sunbeltrentals.com/equipment/detail/1222/0440004/pallet-truck-high-lift/ eFL Series Order Checklist, Receiving & Assembly Instructions REV: 3/13/2022 Page 5 of 8...
  • Page 6 Alternatively, there are slots in the sides of the frame you can use to lift if you have a forklift. eFL Series Order Checklist, Receiving & Assembly Instructions REV: 3/13/2022...
  • Page 7 OPTIONAL CASTERS – THEY ARE SHOWN MUST BE ORDERED AS AN OPTION. THE OPTION INCLUDES STIFFENING BRACKETS, CASTERS, AND HARDWARE. FLOOR-MOUNT-BRACKETS/ CASTER-MOUNT-BRACKETS LEG CROSS-SUPPORTS eFL Series Order Checklist, Receiving & Assembly Instructions REV: 3/13/2022 Page 7 of 8...
  • Page 8 Remember, because of the nature and weight of the product, there is some unavoidable risk, and you must always take proper safety precautions. PLEASE RETURN THIS CHECKLIST TO YOUR RESELLER, OR TO SALES@HOTKILNS.COM IF BUYING DIRECT. eFL Series Order Checklist, Receiving & Assembly Instructions REV: 3/13/2022 Page 8 of 8...

This manual is also suitable for:

Efl 1626Efl 2026Efl 2626Efl2635