Download Print this page

Advertisement

Quick Links

ASSEMBLY MANUAL: BLINDS HIT I
ASSEMBLY
Assemble exactly according to this manual to prevent redundant assembly errors and other related problems.
AIDS FOR ASSEMBLY:
electric drill, drills
cross-head screwdriver
knife, scissors, pliers
screw
drill with the diameter Ø
INSPECTION:
• Before assembly we recommend inspecting all parts after the delivery of the goods to prevent any problems.
Themanufacturer must be
notified of any defects or comments concerning the assembly or blinds.
ASSEMBLY
• never expand the blind before assembly
• on the blind in the window wing check that the dimension corresponds to the width of the window
• check that the control mechanism is located on the correct side; it is possible to relocate the control mechanism,
ifnecessary, although only after being properly trained
• depending on the depth and form of the glazing bar, support the blind using pads
• screw the blind to the window frame using two or three screws according to the size of the blind; for plastic windowsonly
screw into the glazing bar in orderto prevent damage to the window wing.
• drill upwards into the lower part of the glazing bar and drill holes for the tightening pins for the leading nylon which passin
the side boards, then tighten the redundant ends and insert the remaining ends of the nylon into the upper profile of the
blind.
• cover boards with decorative covers
• fix the clamping piece of the chain; for plastic windows, again only into the glazing bar,
• check the function of the blind
If it is not possible to drill holes for the tightening pins into the glazing bar from upwards because of the shape or the size of
the glazing bar, choose the option of drilling the holes for pins into the face of the glazing bar. With this option take care not
to damage the glass with the drill. It is important to measure the correct depth of the drilling! The client must be informed in
advance of this form of assembly and consent in writing in the handing over protocol. Finally, ensure the full functionalityof
the blind and the window.
for fixing blinds
3,9 x 16; 3,9 x 22
2,5 mm
for fixing the holder of the
chain
3,9 x 16
2,5 mm
hole for tightening pin
3.2 mm for plastic windows
and Al windows; 3 mm for
wooden windows

Advertisement

loading

Summary of Contents for Labona HIT

  • Page 1 ASSEMBLY MANUAL: BLINDS HIT I ASSEMBLY Assemble exactly according to this manual to prevent redundant assembly errors and other related problems. AIDS FOR ASSEMBLY: • electric drill, drills • cross-head screwdriver • knife, scissors, pliers for fixing blinds for fixing the holder of the...
  • Page 2 ATTENTION! During assembly it is necessary to place the blind in the window when it is lifted up; mark the position of the screws on the window wing, fit the blind and then lower it. Each manipulation of the blind before assembly (if necessary) is only to be performed in the horizontal position Any other manipulation is forbidden and claims for such damaged blinds will not be accepted! ATTENTION!
  • Page 3 ILLUSTRATIVE ASSEMBLY...

This manual is also suitable for:

Hit i