Download Print this page

Flow-Rite QWIK-FILL MP-2000 Installation And Operation

On-board battery watering system

Advertisement

Quick Links

Package Contents
Installation
Important
Prior to initial installation, inspect
the existing battery water level. If
they have been neglected and the
level is extremely low, manually fill
each cell so all plates are covered.
Then, charge the batteries, before
installing and using Qwik-Fill to top
off. Topping off a battery that has
been neglected and then charging
can cause the water level to expand
during the charging process resulting
in the loss of electrolyte. Once Qwik-
Fill is installed, monthly topping
off after charging will prevent an
extremely low water level to occur.
3
Link multiple batteries together using the
clear tubing. If the batteries are separated
by several feet, allow the tubing to sag
between batteries. Ensure that the tops
of all batteries linked together are at the
same level. For optimum performance,
it is best to limit the number of batteries
connected to a single fill point to two.
Qwik-Fill On-Board Battery Watering System
Installation and Operation
1
Join two manifolds together as shown
using the appropriate size manifold jumper
for your battery group size. The manifold
jumpers are marked and can be easily cut
with a utility knife or a pair of scissors.
4
Connect the water supply line to one end
of the battery "chain". The 4' of tubing
supplied may be cut to the desired length
or if a longer length is required 20' of 1/4"
ID flexible tubing is available in the Qwik-
Fill accessory pack. (sold separately)
Illustration purposes only. Actual product is subject to change.
2
Carefully remove your battery's existing
caps and insert a manifold assembly into
each battery. Press each assembly firmly in
place so that it fits flush with the battery
top.
5
Cover the remaining barb with a red end
cap and installation is complete.
BL-186
11/11

Advertisement

loading

Summary of Contents for Flow-Rite QWIK-FILL MP-2000

  • Page 1 Qwik-Fill On-Board Battery Watering System Installation and Operation Package Contents Illustration purposes only. Actual product is subject to change. Installation Important Prior to initial installation, inspect the existing battery water level. If they have been neglected and the level is extremely low, manually fill each cell so all plates are covered.
  • Page 2 Fill Point Battery Required kit Flow-Rite Controls • 960 74th St., Byron Center, MI 49315 • phone: 616-583-1700 • fax: 616-878-5151 • www.flow-rite.com BL-186 Patent Pending 11/11...

This manual is also suitable for:

Qwik-fill mp-2010784176020009784176020108