Download Print this page

Advertisement

Quick Links

HEIGHT CONFIGURATIONS
OPERATION
1- Open the lid and turn the unit ON. Set
the vacuum and seal levels (see below).
CONTROLS
Note: Turning the unit OFF at
any time during the cycle, then
turning it ON after 3 seconds:
this will RESET the unit.
Main switch
This is the main power switch of
the unit.
(a)
Standard support
height
2- Lay the pouches on the shims and align
their opening along the sealing cushion.
-15
ON
0
-30
OFF
USER'S QUICK REFERENCE
(b)
Low support height
TILT position
Remove completely if
Useful for packaging
nedded
liquids
CUT OFF
GAS
VACUUM
(OPTION)
(OPTION)
(c)
3- Start the packaging cycle by closing the
lid (hold the lid closed until you feel a
suction).
VACUUM LEVELS
0 to 5
= period of 2 to 45 seconds
@ vacuum level of 10 to 90%
SEAL
5 to 11
= period of 45 to 90 seconds
@ vacuum levels of 100%
* Higher settings for porous materials such as meat)
SEAL LEVELS
SET to 5
for standard bags.
* Higher settings for thicker bags.
NEL MODELS

Advertisement

loading

Summary of Contents for Hi-Tech NEL 216

  • Page 1 USER’S QUICK REFERENCE NEL MODELS HEIGHT CONFIGURATIONS Low support height TILT position Standard support height Remove completely if Useful for packaging nedded liquids OPERATION 1- Open the lid and turn the unit ON. Set 2- Lay the pouches on the shims and align 3- Start the packaging cycle by closing the the vacuum and seal levels (see below).
  • Page 2 OIL CHANGE QUICK REFERENCE HI-TECH VACUUM Inc. NEL 216/219 MODELS ALWAYS DISCONNECT THE UNIT FROM THE ELECTRICAL OUTLET BEFORE OPENING THE PANEL. 3- Fill with Busch R-580 oil (the oil level 1- Open the back panel (key or socket 5/16).

This manual is also suitable for:

Nel 219