DS1000D & DS1000DGY Drop Spreader
INSTRUCTIONS & Parts List
In order to assure that the assembly of your spreader
goes smoothly, please review all of the steps before
proceeding. TIP: Loosely tighten all bolts until assembly
is complete, then completely tighten.
Note: You may have extra hardware when assembly
is complete.
NOTE: Wheel may vary from pictures
STEP 2 - Attach the Leg Stand
Hand tighten the Leg Stand (04) to the Hopper using
four 1-1/4" Carriage Bolts (10) and 1/4" Wing Nuts (12)
at the four locations shown below.
Hopper (Pre Assembled)
STEP 4 - Attach the Top Handle
Hand tighten the Top Handle (07) to the Side Handles
(06) using two 1-3/4" Carriage Bolts (11) and 1/4" Wing
Nuts (12) at the two locations shown below.
Top Handle (07)
Side Handles (06)
STEP 1 - BEGIN HERE
Lay out all of the parts shown below. If any are
missing, please turn this sheet over and contact us with
the information provided.
Leg Stand (04)
STEP 3 - Attach the Side Handles
Hand tighten the Side Handles (06) to the Leg Stand
(04) using two 1-3/4" Carriage Bolts (11) and
1/4" Wing Nuts (12) at the two locations shown
below.
Leg Stand (04)
STEP - 5 Attach the Control Cable
Attach the Control Cable mechanism to the
Top Handle (07) using a 2-1/4" Carriage Bolt (16)
and a 1/4" Wing Nut (12) at the location shown
below.
Sheet Number: 3860 Rev 8/2005
Hopper (Pre Assembled)
Top Handle (07)
Side Handles (06)
Top Handle (07)
Control Cable
Side Handle (06)
Hardware Sack
Leg Stand (04)