Download Print this page

bauhaus SVELTE SE0811SRW Installation Instructions

Two drawer basin unit & basin

Advertisement

Quick Links

600 Two Drawer Basin Unit
& Basin
SE0611SRW
SE6000D
39kg with basin
x2
x8
Tools & equipment needed: Drill, 8mm Suitable drill bit, Phillips screwdriver, Spirit level, Ruler/tape measure, Pencil,
Silicone sealant (clear).
IMPORTANT - Advice and safety - Please read before installation
Please read these instructions carefully before starting installation
and keep in a safe place for future reference. ENSURE the room is well
heated and ventilated.
Check the contents of the pack carefully before installation. Bauhaus will
not be held responsible for any de-fit / re-fit costs where faulty product has
been fitted.
If any fault is found with materials or workmanship, it must be reported
immediately to the manufacturer. Remedial action will be taken, based on
information received, on condition that: 1. Full details are supplied to the
manufacturer; 2. The product has not been modified or tampered with;
3. The manufacturer is informed of any damage/shortages prior to
installation. 4. The product has not been installed, or attempts have been
made to install.
We do not accept responsibility for any problems that may occur through
incorrect installation.
Advice & Safety
This product should be only be installed by a suitably qualified Plumber/
installer. Should the installation be completed by a non-qualified person any
product guarantee maybe considered invalid. For a claim made under our
warranty written certification of your installers qualifications can be required.
It is advised that all doors and drawers are removed prior to fitting to avoid
unnecessary damage occurring.
It is recommended that the furniture and accessories are installed after
tiling, ensuring that the product is installed flat to the tile face and allows
product to be easily removed if required in the future.
This document has been prepared for your guidance, you must exercise
due care at all times.
Please note that some units are heavy. Always take care when lifting, and
follow health and safety guidelines. It is recommended that 2 people carry
out the installation of larger basin/vanity units over 30Kgs gross weight.
INSTALLATION INSTRUCTIONS
BATHROOM FURNITURE RANGE
800 Two Drawer Basin Unit
& Basin
SE0811SRW
SE8000D
46kg with basin
1000 Two Drawer Basin Unit
& Basin
SE1111SRW
SE1000D
60kg with basin
x2
x8
Warning! Please check for any hidden pipes or electrical cables before
drilling holes in the floor or walls.
When using power tools always follow the manufacturer's user instructions.
This installation guide details fitting to a solid wall. If your bathroom has
studded/plasterboard walls, please use appropriate plasterboard fixings.
Please ensure the wall can take weight of units detailed above. Before
installing a wooden bathroom unit into a new property, extension or recently
plastered room we strongly advise the building/room is completely dry, well
ventilated and adequately heated.
Important pre-installation notes
To ensure full working use of the drawers we recommend the use of
Bauhaus basin furniture trap BTR0410W.
Care & Cleaning
Cast mineral marble products should be cleaned regularly with warm soapy
water, then rinsed with clean water and, if desired, dried and polished with
a soft cloth. Lime scale deposits can be removed using a 50:50 solution of
warm water and lime scale remover and soft clean cloth. We recommend
regular cleaning with Bauhaus Cream Polish SD150RW, specially
formulated to clean and help protect the surface of cast mineral marble
basins.
Do not use abrasive cleaners or bleach in this will permanently damage the
high gloss surface.
Use a well wrung chamois leather or micro fibre cloth to clean furniture
carcasses.
If any maintenance is required then it must be carried out by a qualified
Plumber.
The manufacturer reserves the right to make technical modifications without
prior notice.
SVELTE
1200 Two Drawer Basin Unit
& Basin
SE1211SRW
SE1200D
73kg with basin
x2
x8
x2
x8
1

Advertisement

loading
Need help?

Need help?

Do you have a question about the SVELTE SE0811SRW and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for bauhaus SVELTE SE0811SRW

  • Page 1 When using power tools always follow the manufacturer’s user instructions. Check the contents of the pack carefully before installation. Bauhaus will This installation guide details fitting to a solid wall. If your bathroom has not be held responsible for any de-fit / re-fit costs where faulty product has studded/plasterboard walls, please use appropriate plasterboard fixings.
  • Page 2 801 02 Z1 IN www.camar.i t /warning Basin & Basin Unit Installation 4800 1200 Step 1 Step 2 Plan unit position Remove the drawers before installation. Pull out fully, lift the front, pull out again, lower and fully remove. Decide on the position and height of the unit. The recommended basin height is between 860mm and 870mm from floor to top of basin.
  • Page 3 Step 4 a: Check the unit is level. If levelling is required, use a screwdriver to adjust the hanging position, as follows: b: To lift or lower the unit, adjust the screw shown. c: To move the unit closer or further from the wall, adjust the screw shown.
  • Page 4 For any further information please contact Bauhaus on: absolutely, minor variations in the dimensional tolerance, 0345 873 8840 form and surface of the finished products will occur.

This manual is also suitable for:

Svelte se1111srwSvelte se1211srwSvelte se0611srwSvelte se6000dSvelte se8000dSvelte se1200d ... Show all