PPLV8
Installation Guide
1
1. Fix rectangle pole
on base plate with 4 x
M8 screws.
2. Fix 4 metal pieces
in rectangle pole A
with 12 x M5 screws.
3
3. Fix rectangle pole B
on rectangle pole A
with 12 x M5 screws.
4. Fix metal plate on rectangle
pole with 4 x M5 screws.
5. Put extension cord
through rectangle pole.
6. Connect power cord with the
extension cord.
6
4
5
8. Unscrew 2 screws on
the cover at the bottom.
7
7. Fix PPLV8 on
rectangle pole with
4 x M5 Hex screws.
8

Advertisement

loading

Summary of Contents for ChargeTech Y2-PPLV8

  • Page 1 PPLV8 Installation Guide 3. Fix rectangle pole B on rectangle pole A with 12 x M5 screws. 7. Fix PPLV8 on rectangle pole with 4 x M5 Hex screws. 1. Fix rectangle pole 4. Fix metal plate on rectangle on base plate with 4 x pole with 4 x M5 screws.
  • Page 2 Option A: Fix product on wall Option B: Fix product on ground 1. Fix 2 x L racks on the top of the product by using 2 x M3 screws. 2. Mark the hole on wall. Drill 2 x Ø6mm holes on wall according to the Mark.
  • Page 3 B. Replace Cable PPLV8 Installation Guide Hang on wall Ø6mm Ø6mm 462 mm 3. Fix 2 x L racks on the bottom of the product 1. Drill 2 x Ø6mm holes (Suggest: 2m height) by using 2 x M3 screws. on wall according to the drawing.
  • Page 4 Administrative Mode Set up of Admin Password, Press “0” “#” “0” “#” “0” “#” to enter Admin Mode. - Model no.: Y2-PPLV8 LCD Displays: - Input : AC 100 - 240V / 50~60Hz - Output (per locker box) : 5V/2.4A Max...