Download Print this page
Abt POLYDRAIN PDX-Pin Lock Installation Manual

Abt POLYDRAIN PDX-Pin Lock Installation Manual

Pre-engineered surface drainage

Advertisement

Quick Links

PolyDrain
Pre-Engineered Surface Drainage
PDX - Pin Lock
Installation Guide
P.O. Box 837 - 259 Murdock Road - Troutman, NC 28166
Tel (704) 528-9806 - Fax (704) 528-5478 - www.abtdrains.com
Toll free in the USA, Canada, and Mexico (800) 438-6057

Advertisement

loading

Summary of Contents for Abt POLYDRAIN PDX-Pin Lock

  • Page 1 PolyDrain Pre-Engineered Surface Drainage PDX - Pin Lock Installation Guide P.O. Box 837 - 259 Murdock Road - Troutman, NC 28166 Tel (704) 528-9806 - Fax (704) 528-5478 - www.abtdrains.com Toll free in the USA, Canada, and Mexico (800) 438-6057...
  • Page 2 Hexagon Head Screw Some products sold by ABT contain chemicals known to the State of California to cause cancer, birth defects or other reproductive harm. Products sold by ABT may contain these chemicals in a smaller amount than Proposition 65's concern, or not at all, however, we have chosen to issue this warning on all of our products as an act of caution and because our customers have the right to know.
  • Page 3 2" Min 1/2" Min Anchor Slab 1. EXCAVATION Above Dirt Above U-Leg 2. LEG ATTACH T = per Structural Engineer Grade Stake Tie Wire Set Top of Rails to Finished Elevation End Rail Caulk or Adhesive (as Specified) 3. SUPPORT LUMBER ATTACH Caulk Channel Joints as Specified Blank or Horiz.
  • Page 4 Verify Trench Alignment and Elevation Cut Excess Length from U-Legs 8. FINAL ALIGN & U-LEG TRIM 7. PLACE ANCHOR SLAB See Step 1 for Dimension Remove Foam After Concrete Placement Expansion Joint Materal Use Vibrator to per Structural Engineer Consolidate Concrete Batter Boards as Required Remove Suspension Lumber as Required...

This manual is also suitable for:

Polydrain pdx