Download Print this page

Barbarian Basketball Systems Titanium Series Assembly Instructions And Owner's Manual

Adjustable basketball system

Advertisement

Quick Links

Barbarian Basketball Systems Inc.
Titanium Series
ADJUSTABLE BASKETBALL SYSTEM
ASSEMBLY INSTRUCTIONS AND OWNER'S MANUAL
Model - GC-5x60
!
WARNING
FAILURE TO COMPLY WITH ANY OF
THE WARNINGS IN THESE INSTRUCTIONS
MAY RESULT IN SERIOUS PERSONAL
INJURY.
FAILURE TO COMPLY MAY ALSO
RESULT IN PROPERTY DAMAGE.
PLEASE HEED ALL WARNINGS AND
CAUTIONS TO ENSURE YOUR SAFETY.
DO NOT ATTEMPT TO ASSEMBLE
THIS SYSTEM WITHOUT CAREFULLY
READING AND FOLLOWING ALL
INSTRUCTIONS. BEGIN BY IDENTIFYING
AND TAKING INVENTORY OF ALL PARTS
USING THE PARTS LIST PROVIDED.
Keep this instruction manual in case you have to contact the manufacturer for replacement parts.
!
1

Advertisement

loading

Summary of Contents for Barbarian Basketball Systems Titanium Series

  • Page 1 Barbarian Basketball Systems Inc. Titanium Series ADJUSTABLE BASKETBALL SYSTEM ASSEMBLY INSTRUCTIONS AND OWNER'S MANUAL Model - GC-5x60 WARNING FAILURE TO COMPLY WITH ANY OF THE WARNINGS IN THESE INSTRUCTIONS MAY RESULT IN SERIOUS PERSONAL INJURY. FAILURE TO COMPLY MAY ALSO RESULT IN PROPERTY DAMAGE.
  • Page 3: Part List

    PART LIST PARTS LIST ITEM QTY DESCRIPTION 5"x5"Main Pole Actuator Actuator plastic sleeve HARDWARE LIST Pole/gusset padding Mounting plate ITEM QTY DESCRIPTION Main Extension Arm 10 Nylon Washer M12 Upper Extension Arm Stud M12x265 Backboard Hex bolt M12x240 Flex rim Hex bolt M12x210 Rim Height Sticker Hex Bolt M12x105mm...
  • Page 4 INSTALLATION (Day 1 to Day 4) Prior to anchor system and goal assembly, call utility services for location of underground utility lines before you dig. This assembly needs 5 days totally. Day 1: Anchor system installation. Day 2-4: Allow concrete to cure. Day 5: Complete basketball system installation.
  • Page 5 INSTALLATION (Day5) A hammer or mallet may be needed during assembly. Place the Pole on the Anchor system. Slide one Thick washer M16 (U3) over each J-bolt (U2). Lift the Pole (A) onto Anchor system, secure with one thick washer (U3), one Lock washer M16 (U6) and one Hex nut (U4) for each J-bolt.
  • Page 6 INSTALLATION (Day5) Attach Lower Extension arm (F) to Pole (A), as shown in Figure 7. Secure it with one Hex bolt M12x240 (#3), two Flat washers M12 (#8), two Plastic Washers M12 (#1), one Lock nut M12 ( # ). See Figure 7.
  • Page 7 Figure 9 Attach Upper Extension arm (G)to Pole (A), using one Hex bolt M12x210 (#4), two Flat washers M12 (#8), two Plastic washers M12 (#1), and one Lock nut M12 (#9). See Figure 9 STEP 6 STEP 8 Note: The plastic washer should be placed between Upper extension arm (G) and Pole pivot tube (A).
  • Page 8 Apply Rim Height Sticker Use a tape measure to crank rim up to exactly 10' from playing surface. Make a line mark on the Actuator (B) against bottom edge of Actuator Sleeve (C). Crank the rim all the way down to the extreme end. Peel and apply Rim Height sticker to outside of Actuator (B) lining up the mark with the 10' mark on the Rim Height Sticker.

This manual is also suitable for:

Gc-5x60