Download Print this page

KENGURU.PRO D-001 Installation Manual

Workout indoor equipment. indoor sports area

Advertisement

Quick Links

WORKOUT INDOOR EQUIPMENT
Indoor
SPORTS AREA
INSTALLATION
MANUAL
KENGURU.PRO
2017

Advertisement

loading

Summary of Contents for KENGURU.PRO D-001

  • Page 1 WORKOUT INDOOR EQUIPMENT Indoor SPORTS AREA INSTALLATION MANUAL KENGURU.PRO 2017...
  • Page 2 EQUIPMENT FASTENINGS Z-01 Z-02 Z-04 Z-05 Z-06 No. 1 large No. 2 medium Vertical Vertical Straight bar platform column with column with platform connecting connecting flange flange DIN 7991 DIN 1587 DIN 35 Security screw with Countersunk flathead Nut cap M12, galvanized hexagonal recess screws with hexagonal grade 8.8, M10*35...
  • Page 3 E-000 Clamp E-001 Е-002 E-003 Z-07 Crossbar Crossbar Crossbar Bent bar E-013 Monkey bar E-012 Swedish Wall INSTALLATION MANUAL OF INDOOR 2017...
  • Page 4: Installation

    INSTALLATION Installation of equipment must be done in following order: 1. INSTALLING THE COLUMNS ON THE PLATFORM Z-04 Z-01 Z-05 DIN 1587 Z-02 DIN 7991 DIN 7991 DIN 7991 2. SET UP AREA With columns fastened down, the platforms must be placed according to scheme of technical sheet.
  • Page 5 4. INSTALLATION OF CROSSBARS and PARALLEL BARS During pre-montage of DIN 35 equipment, clamp must Е-000 have a 5-6 mm gap Equipment pre-montage DIN 60 must be done on specially prepared surface, preventing paint coating from being damaged. Z-04 Z-05 Then fasten the Firstly, fasten the crossbar by screwing in DIN 60...
  • Page 6 INDOOR AREAS D-002 D-004 D-001 D-003 D-005 D-007 D-006 D-008 D-009 D-010 INSTALLATION MANUAL OF INDOOR 2017...
  • Page 7: Indoor Equipment

    INDOOR EQUIPMENT D-001 D-002 D-003 D-004 D-005 D-006 D-007 D-008 D-009 D-010 Z-01 Z-02 Z-04 Z-05 Z-06 Z-07 E-001 E-002 E-003 E-012 E-013 E-000 clamp DIN 7991 DIN 1587 DIN 35 DIN 60 INSTALLATION MANUAL OF INDOOR 2017...
  • Page 8 2017 WWW.KENGURUPRO.EU E-MAIL: INFO@KENGURUPRO.EU...

This manual is also suitable for:

D-005D-003D-002D-004D-006D-008 ... Show all