Download Print this page

T3 Ping Pong T3 SuperMini Assembly Instructions

Advertisement

Quick Links

T3 SuperMini (T3S)

Assembly Instructions

"Two's company, three's a team"
T3 Ping Pong Ltd, 41-43 Saffron Hill, London EC1N 8FH
T: +44 (0)207 404 9594 F: +44 (0)207 405 0468 www.t3pingpong.com
P-AI/T3S/1
02/15 – V2

Advertisement

loading

Summary of Contents for T3 Ping Pong T3 SuperMini

  • Page 1: Assembly Instructions

    T3 SuperMini (T3S) Assembly Instructions “Two’s company, three’s a team” T3 Ping Pong Ltd, 41-43 Saffron Hill, London EC1N 8FH T: +44 (0)207 404 9594 F: +44 (0)207 405 0468 www.t3pingpong.com P-AI/T3S/1 02/15 – V2...
  • Page 2 5) Push the two halves together fitting dowels to holes and where magnetic dots meet. 6) Slot in each half of net until dowels and magnetic dots meet. Please ensure you have read the ‘Care Instructions’ detailed in the ‘How to Get the best from your T3 SuperMini Table Tennis Table’ www.t3pingpong.com...

This manual is also suitable for:

T3s