MONTE MULTI-FUEL & MONTE EURO MULTI-FUEL
REFER TO APPLIED RESEARCH TEST REPORT 12/2514 APRIL 2012
TESTED in compliance with the requirements of AS/NZS 2918:2001
The Yunca Monte Multi-Fuel and Monte Euro Multi-Fuel are NOT clean-air approved.
A. Yunca recommends that competent trades persons carry out all installations (e.g. NZHHA
Registered Installer), to obtain maximum performance and safe, efficient heating.
B. A permit is required and we suggest you check with local building inspectors as by-laws
do vary from area to area.
Also notify your Insurance Company that a solid fuel heater has been installed.
C. Ash Floor Protector –
1. Must extend a minimum of 300mm in front of the door aperture.
2. Must extend at least 125mm from each side of the heater.
3. Ash Floor Protector must be constructed of non-combustible materials.
D. Seismic restraint – Heater must be restrained from seismic movement as required by
AS/NZS 2918:2001. 10mm diameter bolting holes in the rear corners allow restraint.
E. Manufacturers recommended tested minimum clearances from combustible walls:
Tested to NZS by APPLIED RESEARCH SERVICES
Rear Clearance (with YUNCA flue guard fitted)
Side Clearance (with YUNCA flue guard fitted)
Corner Clearance (with YUNCA flue guard fitted)
F. YUNCA Flue Kit (Complies to AS/NZS 2918:2001 Appendix F): FIG A, B & E
1. 4.2m x 150mm stainless steel flue.
2. 2.4m x 250mm galvanised liner.
3. 1 x ceiling tile.
Please Note: All joints must be sealed with flue sealing compound. Use stainless steel
screws or rivets to join the flue pipe (three equally spaced places at each joint). The first
length of flue must be fixed to the flue spigot with at least one stainless steel screw or rivet.
The required minimum flue termination height is 4.6 m above the floor protector.
G. MULTI-FUEL & EURO MULTI-FUEL Flue Mounted Shield (Flue Guard) Kit: FIG A
Complies (with heater) to AS/NZS 2918:2001
1 x 1200mm length lined Back Guard.
1 x 1200mm length Perforated Front Guard.
1 x 1200mm length Tertiary Back Guard with spacers.
1 x top front deflector shield (half round shaped, angled when installed).
Please Note: The minimum Flue Guard Height is 1200mm.
Monte Multi & Monte Euro Multi Installation - AUG_2014.doc
A division of Terry Young Ltd, New Zealand
INSTALLATION INSTRUCTIONS for
FREESTANDING BURNER
4. 1 x insulation boundary shield.
5. 2 x spider brackets.
6. 1 x weather cap & cowl.
7. 4 x support angles
Clearance
www.yunca.co.nz
150mm
400mm
200mm
Page 1 of 4

Advertisement

loading

Summary of Contents for Yunca Heating MONTE

  • Page 1 REFER TO APPLIED RESEARCH TEST REPORT 12/2514 APRIL 2012 TESTED in compliance with the requirements of AS/NZS 2918:2001 The Yunca Monte Multi-Fuel and Monte Euro Multi-Fuel are NOT clean-air approved. A. Yunca recommends that competent trades persons carry out all installations (e.g. NZHHA Registered Installer), to obtain maximum performance and safe, efficient heating.
  • Page 2 MONTE MULTI-FUEL & MONTE EURO MULTI-FUEL – TYPICAL FLUE INSTALLATION (drawings on the following pages not drawn to scale) FIG A MONTE MULTI-FUEL & MONTE EURO MULTI-FUEL Flue Mounted Shield (Flue Guard) Kit Installation Complies (with heater) to AS/NZS 2918:2001 ENLARGEMENT OF CEI LI NG ASSEMBLY FIG B.
  • Page 3 FIG. C: HEATER DIMENSIONS & WATER BOOSTER POSITION – Monte MF & Euro MF (not to scale) FIG.D: HEATER POSITION. (Not to scale) Above: Non combustible wall clearances. Brick lining. From the floor to within 25mm of ceiling. Leave air vents at the bottom to allow airflow in the cavity.
  • Page 4: Important Information

    Secure the heater base to the hearth or sub-framing with Dynabolts or similar, through the holes provided in the heater base. Follow local Council’s Specifications. The Yunca Monte Multi-Fuel and Monte Euro Multi-Fuel are NOT clean-air approved. Monte Multi & Monte Euro Multi Installation - AUG_2014.doc www.yunca.co.nz...