Warning! Any person involved with transport, installation, energizing, operation and maintenance of Current Transformer (CT) type OSKF72 must read these instructions prior to any action related to these current transformers. These CT are built under strict conditions which guarantee the Highest Quality achievement. In order to keep this high-quality during CT’s lifespan, it is utmost important that the instructions in...
Instruction Manual 1. GENERAL DRAWING Description and characteristics of the OSKF72 Current Transformers. For more details, see set of drawings. 1. Top Cover 2. Oil Level Indicator (metallic bellows) 3. Lifting eyes 4. Primary terminals: aluminum or copper 5. Aluminum casting head housing 6.
This aluminum extended up to the base by an aluminum The active part of the OSKF72 current tube which contains all secondary leads. transformer is located above the cross section earth insulator.
In case of damages, the customer inspector in charge of receipt shall notify 2.5. External metallic parts GE and the insurance representative. All The external metallic parts do not contact information is indicated on require maintenance and they are shipment insurance documents.
Scrub the contact surfaces with a metallic brush (diameter of the thread 0.3mm) and impregnate with grease of Example of lifting a crate of OSKF72 the type “PENETROX” or equivalent. All the surfaces must be completely 3.4. Storage covered with grease.
6.3. Double / Triple Reconnection 6.5. Secondary terminals Primary type (if applicable) Connect protection and/or measure The current ratio of the OSKF72 can be instruments to the secondary terminals single with only one single bar, double or as shown on the nameplate. See the triple primary ratio.
If required, small quantity of oil can be taken. Always verify oil level indicator before take oil samples. Never complete oil volume without prior formal authorization of GE. General drawing for the oil level indicator Important remark: During commissioning, 8.