GE PGP989DN2BB Owner's Manual & Installation Instructions page 17

Gas downdraft cooktop
Table of Contents

Advertisement

Available languages

Available languages

Installation
Instructions
PREPARATION
TOOLS AND MATERIALS
YOU WILL NEED
Saw
° Ducttape
° Measuring tape or scale
° Carpenter's square
° Adjustable wrench or socket set (7/16" socket and
ratchet)
° Drill and drill bit
• 1/4" nutdriver
° Sheet metalscrews
° Pipe wrench
• Manual gas line shut-offvalve
° Pipejoint sealant that resists action of LPgas
• Ductwork to suit the installation
For rigid connection:
• Shut-off valve
• Union
• Pipe fittings as required
For fle×ible connection where local codes permit:
° Flexible metal tubing (same 3/4"or 1/2" I.D.as gas supply
line)
HIGH ALTITUDE ORIFICE CONVERSION KIT
Usefor cooktop operation at elevations above 5000 ft.
(1500m).
Specify kit for Natural Gas or LP Gaswhen ordering:
Natural Gas High Altitude
Orifice Conversion Kit .........................
WB28X10114
LPHigh Altitude Orifice Conversion Kit ........ WB28X10115
To order, please call our toll-free number:
National
Parts Center
............
800.626,2002
30" COOKTOP (DIMENSIONS
FOR REFERENCE ONLY)
Unit shown fully assembled,
22_d'
_(22gAd
' SS)_,'-
_
20½" _i
29_"
-,t
(30" SS)
_1
I
l'
Unit must be vented to the outside!
17

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Pgp989sn2ssPgp989tn2ww

Table of Contents