SOL202TIP – SOL808TIP - Tile integrated roof kit manual
Step: 49
Step: 50
P41
11
P41
11
P41
11
Place the connection
strips so that the upper
perforation on the lower
side is aligned with the
collectors edge.
P41
11
P41
11
Align upper
perforation
with collectors
edge!
P41
11
Bend the connection strip
along the perforations on
the lower side.
SOLAR
Page 38 of 52
R02893-1 10/13