STEP 3

ATTACH THE CHAIN

DO NOT run the operator until instructed.
STANDARD INSTALLATION
1. Manually open the gate and line up the front bracket so the chain will be level with the idler pulley and parallel to the ground. Weld the front bracket
in this position.
2. Manually close the gate and line up the rear bracket so the chain will be level with the idler pulley and parallel to the ground. Weld the rear bracket
in this position.
3. Route the chain through the operator.
4. Connect the chain to the brackets using the eye bolt hardware. Chain should not be too tight or have excessive slack.
NOTE: The chain should have no more than 1 inch of sag for every 10 feet of chain length.
Rear Bracket
REAR INSTALLATION
NOTE: This installation will require two extra idler
pulleys. Make sure all exposed pinch points are
guarded. Refer to Gate Construction Information on
page 4.
1. Move the back pulley to the bottom hole in the
operator.
2. Manually close the gate and align the bottom bracket
so the chain will be level with the bottom idler pulley
and parallel to the ground. Weld the bottom bracket
in this position.
3. Align the top bracket so the chain will be level with
the top idler pulley and parallel to the ground. Weld
the upper bracket in this position.
4. Route the chain through the operator.
5. Connect the chain to the brackets using the eye bolt
hardware. Chain should not be too tight or have
excessive slack.
NOTE: The chain should have no more than 1 inch of
sag for every 10 feet of chain length.
INSTALLATION
Idler Pulley
12
Front Bracket
Idler Pulley MUST have
safety cover.